My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 1980-1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2903
>
2300 - Underground Storage Tank Program
>
PR0232401
>
BILLING 1980-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:50:01 PM
Creation date
11/7/2018 6:10:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1980-1994
RECORD_ID
PR0232401
PE
2381
FACILITY_ID
FA0003701
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #10
STREET_NUMBER
2903
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11621039
CURRENT_STATUS
02
SITE_LOCATION
2903 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARCH\2903\PR0232401\BILLING 1980-1994.PDF
QuestysFileName
BILLING 1980-1994
QuestysRecordDate
9/1/2017 9:40:46 PM
QuestysRecordID
3621967
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y4 URCE5 <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD a <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B n� �� ao <br /> ss� . <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM, <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATIONPERMANENTLY CLOSED ONSITE <br /> ONE ITEM F] 2 INTERIM PERMIT E:] 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED /1 <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: � ' �, (� <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A, OWNER'S TANK L D.# B. MANUFACTURED BY: /�ar) fes, <br /> C. DATE INST LED(MOlDAYNEAR) Moo D. TANK CAPACITY IN GALLONS: <br /> II.TAN ONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> A. <br /> 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C• _71aUN EADED RLGULAR 3 DIESEL F-16 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT ❑ lb PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> UNLEADED ❑ 5 JETFUEL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED ASA: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALLTHAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTLDTANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL F-] 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD WI FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 1000). METHANOL COMPATIBLE WIFRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LININ [:j4 PHENOLIC LINING <br /> LINING <br /> C.INTERIOR �I 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNK ❑ 99 OTHER <br /> E-J <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES NOV <br /> 0.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A, U 95 UNKNOWN A U 99 OTHER <br /> rrS <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 INTEROMONITTIAL ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTYMATED DOTE LAT SED <br /> �rEO�AY/YR) 2.ESTIMATED QUANTITY OF 3,WAS TANK FILLED WITH <br /> G % SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES ❑ NO <br /> THIS FORM NAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, 1S TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED a SIGNATUREy <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# ❑❑ p f <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION'DATE <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEE �ILF�D, <br /> � �� f5o Ir FOR005413-R5 <br /> J <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.