Laserfiche WebLink
I <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN — (Page 2 of T <br /> VI. UNDER DISPENSER CONTAINMENT(UDC) MONITORING (Cheek ail <br /> that <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHODS) <br /> ® i.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490.54 <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) °°0.54 <br /> LEAK MONITOR MANUFACTURER:Veeder ROM °90.55 MODEL M:TLS-M °90 i6 <br /> LEAK SENSOR MANUFACTURER:VOOder ROM °90.59 MODEL g(S):791390-208 490.56 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES ❑ b.NO 4"" <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ e.YES ® b.NO 490""0 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a YES ❑ b.NO 19081 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑ b.NO asoar <br /> UDC CONSTRUCTION IS: --0I.SINGLE WALL ❑ 2.DOUBLE WALL ,was <br /> IF DOUBLE WALL: 4W61e <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 49h <br /> VII. PERIODIC SYSTEM TESTING <br /> L ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br /> MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE UIRED.123 oat PW 1 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. °99dr <br /> VIII. RECORD KEEPING <br /> The following monaming/maintenance records are kept for this facility: aw-Oa <br /> ® a ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ it SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> 19 h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAIMNG <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties: ,wLb4 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 49 % <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 4soe9r <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 417 %i <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 4a0^9' <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49a�6q' <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 190"99 <br /> ❑ OTHER(Specify): ,seam <br /> oar as <br /> Thu facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the Intematirmal Cade Council 490.t0 <br /> (ICC). The "Designated UST Operator-will train facility employees in the proper operation and maintenance of the UST systems annually.and within 30 <br /> days of hire.This training will include,but is not limited to.the following. <br /> Y Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> Y The facility employee's mle with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> I- The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> D Names)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures am attached to this plan '9an <br /> Ball floats are set at 90%of tank capacity to prevent an overfill. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible ha ensuring thin: I )the daily/routme UST monitoring activities and maintenance of UST leak dr esuion equipment covered <br /> b)this plan occurs.2.)all conditions that indicate apossible release are investigated,and,3.)all monnoring_tecords are maintained-properly. <br /> "THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Shelly Jones 499'12 TITLE:Manager °90.r5 <br /> NAME: Sandy Edwards 490.1 TITLE:Environmental Compliance Administrator i90.t1 <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a repot to the owner/opermor,and inform the owner operator of any <br /> conditions thin need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify that the information provided.herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATUR I DATE: <br /> d s 617/2011 <br /> REFIT Wrol O ®1 Tint 2.F¢ii Owrar r &ahooWlt eenniss of Owner ,9prn <br /> UPCF UST-D(tiatw7 -4l/ www.ualdocs.org <br />