My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1990 CLOSURE IN PLACE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
REMOVAL 1990 CLOSURE IN PLACE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:35 PM
Creation date
11/7/2018 6:28:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1990 CLOSURE IN PLACE
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARIPOSA\2467\PR0231818\1990 CLOSURE IN PLACE .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Names of collectors 1 <br /> - Dates and times of collection <br /> Purpose of sample <br /> _ - Sample distribution (e.g. , laboratory, archive, etc. ) <br /> - Field observations <br /> Field measurements (e.g. , PID readings, pH, <br /> conductivity, water levels) . <br /> Other data records (e.g. development log, soil sampling <br /> report, well log, etc. ) <br /> Procedures for surface soil collection from shallow test <br /> pits are discussed in the appended Soil Sampling Protocol . <br /> Soil samples will be collected using decontaminated <br /> equipment and placed in laboratory prepared containers. <br /> All drilling equipment, pipe, and materials coming in <br /> contact with the borehole material will be decontaminated <br /> before use according to the procedures described in Section <br /> 6.0. All sampling equipment will be decontaminated prior to <br /> sampling following these same procedures. <br /> Soil samples will be collected as monitoring well drilling <br /> progresses . All downhole drilling equipment will be <br /> decontaminated prior to use and between use for each well <br /> according to the procedures described in Section 6.0. <br /> All well construction material, including well casing, <br /> screen, and well caps, will be decontaminated prior to <br /> installation by steam cleaning according to the procedures <br /> described in Section 6.0. <br /> To prevent the transfer of surface contamination to a well, <br /> a Portland cement and bentonite surface seal will be <br /> installed in conformance with regulatory requirements. The <br /> casing will be fitted with a water tight locking cap. No <br /> solvent or glue will be used in well construction. The <br /> wellhead will be contained below grade in a water-tight <br /> traffic rated box or otherwise protected from damage. <br /> In order to assure that groundwater samples are obtained <br /> from formation material and not from the filter pack, wells <br /> will be purged in accordance with the appended <br /> Well Development Protocol. <br /> Samples will be placed in laboratory prepared containers, <br /> appropriate for the analyses specified as indicated on Table <br /> 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.