My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1990 CLOSURE IN PLACE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
REMOVAL 1990 CLOSURE IN PLACE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:35 PM
Creation date
11/7/2018 6:28:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1990 CLOSURE IN PLACE
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARIPOSA\2467\PR0231818\1990 CLOSURE IN PLACE .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 Sampling and Drilling Equipment Decontamination <br /> All equipment used for drilling, well materials and sampling <br /> soil and groundwater will be decontaminated prior to use. <br /> All equipment used for collection of more than one sample, <br /> such as bailers and spoons, will be decontaminated between <br /> each use to prevent cross contamination between samples. <br /> Drilling equipment will be decontaminated prior to <br /> commencing drilling at each hole. <br /> Equipment and well material decontamination will be <br /> conducted on an impermeable surface and all decontamination <br /> effluent will be contained. All surfaces of the equipment <br /> will be thoroughly rinsed with potable water. The equipment <br /> will be placed on a drying rack for air drying. The <br /> decontamination water will stored in containers certified <br /> for hazardous materials storage and disposed of in an <br /> approved manner. <br /> Sample equipment to be used for pesticides and organic <br /> analysis will be washed in a nonphosphate detergent (Alconox <br /> or equivalent ) and rinsed with tap water, followed by <br /> deionized water and finally with acetone. If the equipment <br /> is for metals analysis, the initial rinse will be conducted <br /> with 0. 1 N nitric acid followed by tap water and deionized <br /> water. <br /> 7. 0 Field Equipment Calibration and Maintenance <br /> The following measuring equipment may be used during the <br /> Remedial Investigation. Equipment is grouped by field <br /> activity. Calibration procedures and frequency are listed <br /> for each piece. <br /> Soil Borings and Well Installation- Steel and coated cloth <br /> tape. Calibration: none. <br /> Water Level Measurements in Wells- Steel surveyors tape. <br /> Calibration: manufacturer supplied temperature correction <br /> will be applied as applicable for field conditions . <br /> Electrical well sounders. Calibration: check against steel <br /> surveyor' s tape. <br /> Organic Vapors- Photoionization detector. Calibration: <br /> Daily field Calibration using a benzene standard. <br /> Groundwater 2H Measurement- Digital pH meter. Calibration: <br /> standard pH solutions of 4, 7, and 10 will be utilized for <br /> daily field calibration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.