Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORI aa, <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 4m544 <br />4msae <br />0-1. CONTINUOUS ELECTRONIC MONITORING ❑ 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />❑ 4. NO DISPENSERS ❑ 99. OTHER(Specify): <br />PANEL MANUFACTURER: 49a35 <br />MODEL M: 4sasu <br />LEAK SENSOR MANUFACTURER 49 57 <br />1 MODEL M(S):LA L 4sa58 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS Ja a. YES ❑ b. NO 49P59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN a. YES ❑ b. NO 490c0. <br />-R <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a a YES ❑ b. NO a9a.6r <br />, <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER R&YEs ❑ b. NO 4mm <br />2. UDC CONSTRUCTION IS . SINGLE-WALLED ❑ 2. DOUBLE-WALLED 490b1 <br />IF DOUBLE WALLED: amu. <br />UDC INTERSTITIAL SPACE IS MONITORED BY: 0 1. LIQUID El 2. PRESSURE 0 3. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a YES ❑ b. NO amus <br />VII. PERIODIC SYSTEM TESTING <br />1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED amus. <br />MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br />. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 4m66 <br />3. SPILL BUCKETS ARE TESTED ANNUALLY. amort <br />VIII. RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />JkrAlamin logs 490.6&, ❑ Visual Inspection Records 4m b ❑ Tank integrity testing results 4m & <br />SIR testing results (and supporting documentation records). 49a.6gd ❑ Tank gauging results (and supporting documentation records). 49obge <br />ATG Testing results (and supporting documentation records). 49 8f ❑ Corrosion Protection 60-day logs 4mug <br />)ELI6quipmem maintenance and calibration records. 490 n <br />DL TRAINING <br />Perwnnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 4m % <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />S UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 4m % <br />,K-OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 490.69c <br />Ll CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4m w <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490 v <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 490w1` <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" e9o.6vg <br />❑ OTHER (Specify): M6914 msA <br />is facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br />D The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />L The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />10 Names of contact person(s) for emergencies and monitoring alarms. 49 70 <br />X. COMMENTSIADDITIONAL INFORMATION <br />Provide additional comments here or indicate law pages information on specific monnitorin(g` procedures areattachedto this plan. 4sa7i <br />®many 1with `additional <br />f [ <br />XI. PERSONNEL RESPONSIBIUTIES <br />The UST Owner/Operator is responsible for ensuring that: 1) the daily/mutine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The followi n(s) are responsible for performing the monitoring and equipment maintenance: <br />NAME 49042 TITLE `� P 490.73 <br />NAME i �- 4m74 TITLE �� 49ors <br />The Designated Operator shall perform m nthly visual inspection of the facility, provide a rt to the owner pastor, an inform the owner/operator of any <br />conditions that need follow-up action. <br />XII. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: 1 certify that the information provided herein is we and accruate to the best of my knowledge. <br />APPLICANT SIGNATURE amru <br />DATE: ++0-73 <br />nn <br />��1��` / <br />t <br />(/ <br />APPLICANT NAME (print): J90.48 <br />APPLIC TITLE: 490"79 <br />UPCF UST -D (12/2007) 314 <br />