My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2002 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
BILLING 2002 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:38:10 PM
Creation date
11/7/2018 6:28:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2002 - 2013
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARIPOSA\2467\PR0231818\BILLING 2002 - 2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQ%_4 NwiNTY ENNMONMENTAL HEALTH <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN —PAGE 1 F P 14 20nj <br />TYPE OF ACTION - ❑. 1. NEW PLAN ❑ £ CHANGE OF INFORMATION „ ,..._ <br />PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. . v r 1 ,y <br />PERMITiSER`JICtS <br />Moz <br />(Check one item only) ❑THIS PIAN COVERS ONLY THE FOLLOWING UST SYSTEM(S):--___.—- <br />�,LFAGIIs�`3t-INFORMATION,_ <br />FACILITY ID k (Agency Use 0,1y I Em— f <br />mos. <br />FACILITY NAME' 5 C <br />n <br />FACILITY SITE ADDRESS AY 3 •c- PO M04 <br />E (' <br />CITY %6e.K1-on/ <br />mos. <br />II.EQUIPMENT TESTING-AND PREVENTIVE'MMNTENANCE `= <br />Slate law requires that testing, preventive maintenance, and calibration of rmnitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed Nn <br />MOS. <br />accordance with the equipment manufacturers' instructions, or annually, whichever is more frequent- Such work must be performed by qualified persontrel. <br />MONITORING EQUIPMENT IS SERVICED [ 1. ANNUALLY ❑ 99.OTHER (Specify): <br />mor. <br />u , <br />TF. W,. MONITbRING U'0" <br />Thismonitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e., location of each sensor, <br />line leak detector, monitoring system control panel, etc.). If you already have a diagram (e.g., current UST Monitoring Site Pian horn a Monitoring System Certification <br />fomi, Hazardous Materials Business Plan ma , etc. which shows all r ufred infomiation, include it with this plan. <br />.� ..� .. <br />...xt iv:-TArfl�MoriTaRnv::. <br />MONITORING TS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />Mia. <br />19 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT V AULT(S) <br />SECONDARY CONTAINMENT IS: a. DRY E]b. LIQUID FILLED [Ic. UNDER PRESSURE ❑./- d. UNDER VACUUM <br />mil. <br />PANEL MANUFACTURER: dv Miz MODEL#:/S /ooI <br />Mu. <br />LEAK SENSOR MANUFACTURER: �/A(d0A1 MI4' MODEL#(S): `TSP^UL$' <br />MIS. <br />❑ - 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(Sl <br />PANEL MANUFACTURER: MIS. MODEL M. <br />n117. <br />IN-TANK PROBE MANUFACTURER: MIS. MODEL #(S).1 <br />MIP. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ IS. DAILY/NIGHTLY ❑ c-WEEKLY <br />A420 <br />z ❑ d. MONTHLY ❑ e. OTHER (Specify): M21. <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />"t2' <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ IS. 60 HOURS <br />na3_ <br />❑ 5. INTEGRITYIFSTING PER 23 CCR §2643.1 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): mea. M27 <br />❑ 6. VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY taequla oaea�y rowu.rtl <br />❑ 99- OTHER(Specify): <br />nae_ <br />V `'EIDE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />1iLio� <br />CQ 1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)?RENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: W a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />"ul <br />PANEL MANUFACTURER: NC A/ nnz. MODEL #:'4 /60� <br />W3_ <br />LEAK SENSOR MANUFACTURER: /4/Cd mss. MODEL #(S): �10 <br />M35. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUl44P (N.e:, TURBINE) SHUTDOWN? K a. YES ❑ b. NO <br />W6 <br />WILL FAILURFJDLSCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? JR a. YES ❑ IS. NO M33- <br />E 't. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LFAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DiTE n <br />MITA MANUFACTURER(s): E^ cf'� MODEL #(S): cSTc-T — HL — / J <br />m39. <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p b. LEAK TESTS <br />ELLD MANUFACTURER: Moa MODEL#: <br />M41_ <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ L MINA4UM MONTHLY 02 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />542 <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YFS ❑ b. NO <br />Mos <br />WILL ELLD FAILUREIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />Mu. <br />❑ 4. INTEGRITY TESTING <br />TEST FREQUENCY: L ANNUALLY ❑ IS. EVERY 3 YEARS ❑ c. OTHER (Specify) M45 <br />Mos <br />❑ 5.VLSUAL MONITORING DONE: iqa. DAILY ❑ IS. WEEKLY` ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED-' <br />Moi <br />• aegeia ramry q>�~v •• Albrd fa moeiraiey ofuobu:ed rma'cay geauv fuel P�Pba ^^�Y Pr ttSC 4352ti 3@%5; <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />0 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.