My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2002 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
BILLING 2002 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:38:10 PM
Creation date
11/7/2018 6:28:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2002 - 2013
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARIPOSA\2467\PR0231818\BILLING 2002 - 2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOAQ'bwtCOUNTY ENVIRONMENTAL HEALTR"O?ARTMEI�ff <br />SAN <br />UNDERGROUND STORAGE TANK <br />M31. <br />MONITORING PLAN - PAGE 1 SFP <br />PANEL MANUFACTURER: NC W. MODEL#: 7 < 1601 <br />M43 - <br />TYPE OF ACTION ❑ 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />sroi <br />PLAN TYPE MONifORINGIS IDF.NTTCAL FOR ALL US"fs AT THIS FACIL,ffY. PERMIT SERViC ES <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />S07 <br />I. FACILITY INFORMATION <br />OFF <br />FACILITY ID # (Agency Use Onli) <br />M03. <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />FACILITY NAME 3 C <br />MOS <br />Mm CITY � <br />FACILITY SITE ADDRESS a,y31 C—�ry,#VP62 /� Tie Kron/ <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. [Ib. MINIMUM ANNUAL 0.1 g.p.h. <br />II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />Stam law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., senscns, probes, lint leak detectors, etc.) be performed in <br />instructions, or annually, whichever is mo¢ frequent. Such work must be performed by qualified personnel. <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />accordance with the equipment manufacmren, <br />[*I ANNUALLY ❑ 99 OTHER (Specify): <br />Mm <br />MONITORING EQUIPMENT IS SERVICED <br />❑ 5. VISUAL MONITORING DONE: a. DAILY ❑ b. WEEKLY- ❑ c MIN. MONTHLY & EACH TDAE SYSTEM OPERATED" <br />• aem,iea reecv mv.al •• Allew far monk %afuahried emngArKy grra m fuel P'P®g arty M HSC 1252e1.31a7(3, <br />III. MONITORING LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the }ovations where monitoring is perfomKd (i.e., location of each sensor, <br />If have a diagram (eg., current USE Monitoring Site Plan from a Monitoring System Certification <br />line leak detector, monitoring system control panel, etc.). you already <br />forni, H dour Materials Business Plan map etc) which shows all required information, include it with this plan. - <br />IV. TANK MONITORING <br />Mlo <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) <br />DRY ❑ b. LIQUID FILLED 11c. UNDER PRESSURE ❑fid•. DER VACUUM <br />M I <br />SECONDARY CONTAINMENT IS:/ �/®� a. <br />�✓ M1z MODEL#: O0� <br />M1S <br />PANEL MANUFACTURER: L/"`.O <br />I MI4. MODEL#(S): 7s•-QLS <br />P <br />MI5 <br />LEAK SENSOR MANUFACTURER: <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SY TEM USED TO MONITOR RLQ E_WALL TA tMoi ;M <br />mill <br />MODEL #: <br />PANEL MANUFACTURER: <br />M19 <br />IN -TANK PROBE MANUFACTURER: mis, MODEL #(S): <br />❑ <br />C] b. DAILY/NIGHTLY c. WEEKLY <br />M20 <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS a611 <br /><1 ❑ d. MONTHLY ❑ e. OTHER (Specify): <br />acz. <br />My <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 gp.h. ❑ c. OTHER (Specify): <br />st_a <br />❑ 3. INVENTORY RECONCILIATION ❑ & MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />W5 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />❑ 5. INTEGRITYgSTING PER 23 CCR §2643.1 aa� Mn <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNLALLY ❑ c. OTHER (Specify): <br />❑ 6.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY ut";�w�yw -I) <br />aaa. <br />❑ 99.07HER(Specify): <br />V. PIPE MONITORING <br />MJa <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />IQ 1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyTRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />M31. <br />SECONDARY CONTAINMENT IS: ®' a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />PANEL MANUFACTURER: NC W. MODEL#: 7 < 1601 <br />W3 <br />Mas. <br />LEAK SENSOR MANUFACTURER: SNA 6 M34. MODEL #(S): 0 u L S <br />M6 <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? S1 a. YES ❑ b- NO <br />WILL FAILURF/DLSCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ja a. YES ❑ b. NO <br />S07 <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLAW WHEN A LEAK IS DETECTED Wit <br />W9 <br />ML.LD MANUFACTURER(s): MODEL #(S): <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />Moo. MODEL #: <br />ELLD MANUFACTURER: <br />M41 <br />M2 <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. [Ib. MINIMUM ANNUAL 0.1 g.p.h. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M43 <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />MM <br />❑ 4. INTEGRITY TESTING sus <br />TEST FREQUENCY: BL a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) <br />MM <br />❑ 5. VISUAL MONITORING DONE: a. DAILY ❑ b. WEEKLY- ❑ c MIN. MONTHLY & EACH TDAE SYSTEM OPERATED" <br />• aem,iea reecv mv.al •• Allew far monk %afuahried emngArKy grra m fuel P'P®g arty M HSC 1252e1.31a7(3, <br />MO <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(aH3) <br />T'1 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.