Laserfiche WebLink
NINE BJJ COMPANY, INC <br />NL►sPOST OFFICE BOX 30010 <br />►' STOCKTON, CA 95213-0010 <br />�N MONITORING AND RESPONSE PLAN RED)���i�� V �I <br />STORAGE TANK MONITORING PRO G yq � ��� <br />This monitoring program must be kept at the UST location at all times. The information on this monito prmgrrtntaTP12 <br />conditions of the operating pe The permit holder must notify Enviromnental Health Department 468-3420 <br />within 30 days of any changes to the monitoring procedures, unless required to obtain approval or a=UQi,TH <br />the change. Required by CCR 2632 (d) and 2641 (h) PERMIT/SERVICES <br />FACILITYNAME BJJ CO DATE MAY,23, 2002 <br />FACILITY,ADDRESS 2431 E. MARIPOSA RD_ STOCKTON CA 95205 <br />1.Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br />TOM J. KOSTA DISPATCHER -MONITORING <br />2.Describe the frequency of performing the monitoring for: <br />TANKS 1 S 2 DAILY PIPING <br />3.Describe the location(s) of where the monitoring will be performed. ie: location ofsensors <br />LBISVNW�' 067M <br />4.Describe the following equipment for each underground storage tank. <br />Name and Model of Monitoring Panel <br />TS -2001 TANK SENTINEL INCON <br />Name and Model of Line Leak Detectors FE PETRO STP MLD MECHANICAL <br />Name and Model of Annular Sensors INCON TSP-ULS <br />Name and Model of Piping Sensors INCON TSP-ULS <br />Name and Model of Dispenser Sensors INCON TSP-ULS <br />Type of overfill prevention OPW-6150 <br />5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes K No 0 <br />Does the turbine shut down if a sensor is disconnected? YesXl No 0 <br />-_ <br />n%= the turbine shut down is the momtoringnanellose �-- _ - -- Yes�l No I1 —_-- -- -- <br />6. How will the alarm history and subsequent maintenance be recorded? <br />AUTOMATIC TAPE PRINTOUT ERnM TNlY1N TS-lool <br />7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br />Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br />annual monitoring certification be performed in? EACH MAY- RECORDED ONTO STANDARD FngM -' <br />Note: For new installations the secondary containment must be tested 6 months after installation. All secondary containment systems <br />must be tested once every 36 months with initial testing performed before December3l, 2003.. <br />8. Describe the training necessary for the operation of UST system, including piping, and the monitoring <br />equipment. SET UP PROGRAMING GUIDE- OPERATORS GIiTDF TRarNTNr_ BY SHIELDS WRPEV, <br />TARTUP TECH, UST AND PIPING SYSTEM TRAINING FOR OPERATOR BYJPC INC. INSTALLERS <br />1:4imtemi4e\USI1mm itoringplan.doc <br />124/2002 <br />