My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2002 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2467
>
2300 - Underground Storage Tank Program
>
PR0231818
>
BILLING 2002 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:38:10 PM
Creation date
11/7/2018 6:28:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2002 - 2013
RECORD_ID
PR0231818
PE
2361
FACILITY_ID
FA0022456
FACILITY_NAME
Foodliner, Inc.
STREET_NUMBER
2467
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2467 E Mariposa Rd
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MARIPOSA\2467\PR0231818\BILLING 2002 - 2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORD' - <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Pan I of 2) <br />TYPE OF ACTION ❑ 1. NEW PLAN 2. CHANGE OF INFORMATION <br />PLAN TYPE W1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />490'2 <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br />L FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />BUSINESS NAME (Same a FACILITY NAME) '� C <br />LL 11 <br />3' <br />N <br />m3_ CITY <br />BUSINESS SITE ADDRESS_ENT <br />106 <br />0 <br />TES <br />H, EQUIPMG AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be perfonred at the Frequency <br />specified by the equipment manufacturers' inshuctions, or annually, whichever is more frequent, and that such work must be perfmmed by qualified personnel. <br />23 CCR §2632,2634,2638,2641 <br />MONITORING EQUIPMENT IS SERVICED ANNUALLY ❑ 99. OTHER (S <br />(Specify): <br />490.3° <br />490.36 <br />HI. MONITORING LOCATIONS <br />❑ I. NEW SITE PLOT PLANmAP SUBMITTED WITH THIS PLAN._P1q. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR §2632, <br />2634 <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br />JR1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL.) SPACE(S) OR SECONDARY CONTAINMENT <br />490.5 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS, (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT S: DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />49 <br />PANEL MANUFACTURER: 490.7. MODEL #: <br />4904 <br />LEAK SENSOR MANUFACTURER: 490.9 MODEL #(S): <br />4940 <br />2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED O MONITOR SINGLE WALL TANK(Sk (23 CCR §2643) <br />490-1 1 <br />PANEL MANUFACTURER 490.11 MODEL #: <br />49-13 <br />IN -TANK PROBE MANUFACTURER: 490.14 MODEL #(S): <br />°90'15 <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />490.16 <br />❑ d. MONTHLY ❑ e. OTHER (Specify): <br />°9013 <br />PROGRAMMED TESTS: ❑ a. 0.1 gp.h. ❑ b. 0.2 gp.h. ❑ e. OTHER (Specify): <br />490.13 <br />490.19 <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION (23 CCR §2646.1): <br />490.20 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) (23 CCR §2645). TESTING PERIOD: ❑ a 36 HOURS ❑ b. 60 HOURS <br />ern <br />5. TANK INTEGRITY TESTING (23 CCR §2643.1): <br />4WD <br />TEST FREQUENCY: ❑ a ANNUALLY [I490.24 b. BIENNIALLY ❑ c. OTHER (Specify): <br />49 O <br />❑99. OTHER (Specify): <br />490.26 <br />4mV <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />. CONTINUOUS MONITORING OF PIPE/ PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br />490.71 <br />UAL ALARMS (23 CCR §2636) <br />SECONDARY CONTAINMENT LS: JW. DRY ❑b. LIQUID FILLED ❑c. PRESSURIZED ❑d. UNDER VACUUM <br />490.n <br />PANEL MANUFACTURER: 4fl M <br />MODEL #: <br />4W31 <br />LEAK SENSOR MANUFACTURER: 390.32 <br />MODEL S): <br />49033 <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. jjj�a YES ❑ b. NO <br />4WM <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. j5jbh. YES ❑ b. NO <br />49033 <br />Mk2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR <br />490.36 <br />MLLD MANUFACIURER(S): 49 37 MODEL #(S): _ <br />4 m <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />490.39 <br />ELLD MANUFACTURER(S) 090°01 MODEL S): <br />4903 <br />PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0.2 g.p.h. ❑ 2. MINIMUM ANNUAL 0.1 g.p.h. <br />49042 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />49043 <br />ELLD FAILUREIDISCONNECfION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑ b. NO <br />490.01 <br />4. PIPE INTEGRITY TESTING 49043 <br />TEST FRE UENCY a ANNUALLY b. EVERY 3 YEARS c. OTHERS i 4904649047 <br />Ll 5. VISUAL PIPE MONITORING. <br />49a4s <br />FREQUENCY ❑ a. DAILY ❑ b. WEEKLY ❑ C. MRN. MONTHLY & EACH TIME SYSTEM OPERATED- <br />4949 <br />• Aa9.46 fm moa N and W 9 CA ping Wy W HSC 23281. J <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA (23 CCA §2636(aX3)1. <br />490.50 <br />7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.715 CONNECTED TO THE TANK SYSTEM <br />/90.51 <br />❑ 99. OTHER (Specify) <br />9o -s2490.53 <br />UPCF UST -D (12/2007) I/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.