Laserfiche WebLink
sOARO'OF TRUSTEES SAN JC JUIN LOCAL HEALTH DISTRIC i SERVING <br /> James Culbertson. Pfes. `�"' —/ City of Lodi <br /> Patricia E. Vannuccl. Secy. 1601 East Hazelton Avenue, P. O. Boz 2009 San Joaquin County <br /> Anfhonelle Van Spronsen - _ City of Eacalon <br /> Earl Plmentel Stockton, California 95201 City of Manteca <br /> Fern Bupbea "' 209/466-6781 1,City of Ripon <br /> Daniel L. Flora City of Stockton <br /> John O. Most. M.D. City of Tracy <br /> William J. Wade c Jopl Khanna. M.O., M.P.H., District Health Officer San Joaquin County <br /> Mary Anne Love San Joaquin County <br /> Facility Name MOdZs fallbw i,-,(imwtit <br /> Address ala :21 C-. MQ -TR 551f- U <br /> Date of Inspection �y//€oda 1•� Inspector C karfPs Uv-1 <br /> MONITORING ALTERNATIVE 07 ke C4r-c41rui a2 o 9a1/cN dn'se/ <br /> Limited to undernround storage tanks which <br /> have infrequent inputs and withdrawals and <br /> where the liquic: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> 1 <br /> This monitoring alternative shall include: <br /> Annual precision test on tank and piping. <br /> (//Tank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> / withdrawals. <br /> (/ Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> /Liquid <br /> over weekend) . <br /> V Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> � If liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less , between measurements, an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours, as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> 1 . Precision test(s) must be performed by _ and results submitted to this <br /> office within 30 days of the test. <br /> 2. Tank gauging must be started immediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> EH 23 002 4/86 <br />