Laserfiche WebLink
a 6 o"ce <br /> STATE OF CALIFORNIA "c ° <br /> STATE WATER RESOURCES CONTROL BOARD i a <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> e <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION �I IPE RMANENTLY CLOSE TE <br /> ONE ITEM F-] 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE L- /8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 5 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# / B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> A. ❑ 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C. ❑ 1aUN EAD D G AR 3 DIESEL ❑ 6 AVIATIONGAS <br /> ❑ 2 PETROLEUM ❑ W EMPTY ❑ 1 PRODUCT O ib PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> UNLEADED <br /> E:] 2 LEADED E]3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ ❑ 9L <br /> 9 JOTHER( DESCRIBE IN ITEM D. BELON/) <br /> O. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.4 <br /> III. TANK CONSTRUCTION MARK ONE IT ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 TAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE E:] 6 P YVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 2,\ <br /> VANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD ININO ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHA L? YES NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IFUNDERGR UND,BOTHIFAPPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL p X 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TE TING ❑ 3 MONITORINGINTERSTITIA <br /> ❑ OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING F-17 INTERSTITIAL MONITORING ❑ 91 NONE L:] UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> ; ESTIMAT ATE L T D(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED B 61GNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# EE: Z <br /> T� <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE -�-/� <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN EILED. <br /> �� Q a FOR 8R5 <br />