My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2007 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
16888
>
2300 - Underground Storage Tank Program
>
PR0232523
>
BILLING 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 3:16:07 PM
Creation date
11/7/2018 6:59:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232523
PE
2361
FACILITY_ID
FA0003833
STREET_NUMBER
16888
STREET_NAME
MCKINLEY
STREET_TYPE
Ave
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16888 McKinley Ave
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MCKINLEY\16888\PR0232523\BILLING 2007 - 2015 .PDF
QuestysFileName
BILLING 2007 - 2015
QuestysRecordDate
3/14/2017 6:05:19 PM
QuestysRecordID
3352980
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- age 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING-IS IDENTICAL FOR ALL USPS AT THIS FACILITY. <br /> jCheek one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(Sr <br /> u„ `l< FACILI'TY _1+FEORMATION <br /> FACILITY ID#(Agency Use Omly) <br /> BUSINESSNAME(gamees Fa ""vameorDSA) a <br /> Super Store Industries <br /> BUSINESS SITE ADDRESS 16888 McKinley Ave. no CITY Lathrop <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing preventive maimenanoe,and calibration of monitoring equipment(ag,sensms,probes,line leak doWtO ,etc.)must be performed at the frequency specified <br /> by the equipm®t manufacturers instrucfionR or amw Iv whichever is more frequem.Such work must be performed by qualified personnel-In CCR 92432.24N.263a.264J <br /> MONITORING EQUIPMENT IS SERVICED ® I.ANNUALLY ❑ 99.OTHER(Specily): �. <br /> IIL MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT'PLAN/MAP SUBmu-rED WITH TTHS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED ID CCR 52632,2.341 ago a. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METIIOD(S) rh ak 171 <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-s. <br /> WITH AUDIBLE AND VISUAL ALARMS.123cc292ss7,zm4l <br /> SECONDARY CONTAINMENT IS: ❑ a DRY R b.LIQUID FILLED ❑ a PRESSURIZED ❑ d.UNDER VACUUM 496b' <br /> PANEL MANUFACTURER Veeder-Root 490.7. MODEL#: TLS-350 4908 <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-9' MODEL#(S): VR 302 40-10. <br /> 02.AUTOMATIC TANK GAUGING(ATO)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).Inc 92.31 °90.1x' <br /> PANEL.MANUFACTURER 4 " MODEL#: 49oa3 <br /> IN-TANK PROBE MANUFACTURER: d9-tt MODEL#(S): 490-1s. <br /> LEAK TEST FREQUENCY: ❑ a CONIENUOUS ❑ b. )AILY/NIGHTT,Y ❑ a WEEKLY 490-16, <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): b 17. <br /> PROGRAMMED TESTS: ❑ a 0.1 g.P.b. ❑ b.0.2 g.p.h. El c-OTHER(Specify): ,yo 0.tR <br /> ❑ .MONTHLY STATISTICAL INVENTORY RECONCILIATION Inc kjl .il 490-20. <br /> IV 4.WEEKLY MANUALTANK GAUGING(MTG)(nomimtIi TESTING PERIOD: [Ia.36 HOURS ❑ b.60 HOURS ° . <br /> 49wzz. <br /> ® 3.TANK INTEGRITY TESTING PER C23 ix&f24as 1T ago-n. <br /> TEST FREQUENCY: ® a ANNUALLY ❑ b.BIENNIALLY ❑ a GUTTESpecify) <br /> R 490.24. <br /> { : 490-zz <br /> ❑ 99 OTHER(specify); Daily log for waste oil tank level&weekly tank gauging a '" <br /> - V. PIPE MONITORING ISr PERFORMED USING THE FOLLOWING METHOD(S) h I avr7)9 <br /> 0 1.CONTINUOUS MOhTTORING OF PIPEIPIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. <br /> In cc' SECONDARY CONTAINMENT IS: ® a [IDRY b.LIQUID FILLED ❑ c.PRESSURIZED El d.UNDER VACUUM 499.29' <br /> 23361 <br /> PANEL MANUFACTURER Veeder-Root 490'J0MODEL#: TLS350 °9041' <br /> LEAK SENSOR MANUFACTURER Veeder-Root 490-32 MODEL#(s): VR 208 49043' <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(Le.,TURBINE)SHUTDOWN. ❑ a YES ❑ b.NO 490-34' <br /> FAILURENISCONNECTTON OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a YES ❑ b.NO Osoas. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLID)THAT ROUTINELY PERFORMS 3.0 g p h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 49p36 <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.tz3cc §4 ] <br /> MLLD MANUFACTURER(S)MMI 99 990-31' MODEL#(s): LD 2000 A90-38' <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g pA LEAK TEM.In ccR12,W 49039. <br /> ELLD MANUFACTURER(S)- 49 W0. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a MINIMUM MONTHLY 0.2 g p.L ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-02' <br /> Ell DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑ b.NO 4904z <br /> FYI FAILURF/DISCONNECISON TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ aYES ❑ b.NO 490-a4' <br /> ❑ 4.PIPRIN -GRITYTFKnNC._ �s. <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.EVERY 3 YEARS ❑ a OTHER(Specify) a9o°-490i 6 <br /> ® S.VISUAL PIPE MONITORING. 9 asOrR <br /> FREQUENCY: ® a,DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 40.49. <br /> 'AibmMSx ofuMurcd fotl HSC 29281 <br /> ❑ 6.SUCTION PIPING MEETS EXEMITION CRITERIA-jncCRg243U*K3)1 ago-s0. <br /> ❑ 7.NO REGlILAEED PIPING PER HEALTH AND SAFETY COD$DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM 490.51. <br /> °90 52 <br /> ❑ 99.OTHER(Spedfy) e9osx <br /> UPCF UST-D(12200'7)-H4 www.tuddoraorg <br />
The URL can be used to link to this page
Your browser does not support the video tag.