Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> SPONSE PLAN—PAGE 1 one f nifty) <br /> TYPE OF ACTION ❑ L NEW PLAN 2.CHANGE OF INFORMATION Rol' <br /> L FACILITY INFORMATION <br /> FACILITY ID k (Agency Use Only) <br /> BUSINESS NAME(Same as FACILffY NAME) Roz. <br /> ' d <br /> c :f 'r <br /> BUSINES SITE ADDRESS are Cpfy R04. <br /> cae• C O <br /> L SPILL CONTROL AND CLEANUP METHODS y <br /> This plan addresses unauthorized=leases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> If safe to do m facility personnel will take immediate measures to control or stop any mime(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent malenal will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 fords that <br /> it is non-hazardous. Used absorbent matcri.L reusable or wast., will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material If the water is contaminated,it will be managed as hazardous waste naless a waste determination in accordance with 22 CCR§66262.11 fords <br /> that it is non-hazardous. If the water has a petroleum shcan(i.c.,rainbow colors),it is contaminated A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> We will review,secondary containment systems for possible deterioration ifany of the following conditions occur. <br /> L Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary contai®ent is prone 10 damage from my equipment wed toremove m clean rip hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment <br /> M. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and atter each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete only ifapplicable) <br /> EQUIPMENT I LOCATION AVAILABILITY <br /> RIm. Rin. coo. <br /> R11. R2L <br /> R31. <br /> Rim R22. R32. <br /> R13. R3. 03, <br /> Rb. RN R34. <br /> R15. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)]&ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rom SLE Rso. <br /> NAME R41. TITLE R51. <br /> C C r ' L<S 7- <br /> NAME Rat. TITLE R52. <br /> NAME R43. TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional system testing or data oulleotion ❑Inspection by qualified persons ❑Recalibration of equipment <br /> Other: <br /> R60. <br /> UST Response Plan(3/2008)-1/3 <br />