Laserfiche WebLink
• • <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN—(Page 2 of 2 <br /> VI.UNDER DISPENSER CONTAINMENT'(UDQ MONITORINGthdr lj <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) ago-sab. <br /> LEAK MONrrOR MANUFACTURER Veeder-Root 490.55 MODEL d:TLS-350 49a56. <br /> LEAK SENSOR MANUFACTURER BeaudreauR 490-5/. MODEL tl(S):406 490-5a <br /> DETECTION OF A LEAK UNTOTHE UDC TRIGGERS AUDMU AND VISUAL ALARMS. ® a YES ❑ b.NO 490'59' <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a YES ❑ b.NO 49040. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49"" <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a YES ❑ b.NO 49042 <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WAIL ❑ 2.DOUBLE WALL 490.63. <br /> H DOUBLE WALL: 49044` <br /> LTDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490"6.tb. <br /> \'II PERIODIC SYSTEM TESTING <br /> ❑ L ELD TESTING- THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD "THAT ENHANCED 490"es <br /> LEAKPLTECTION(EELDI MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.I23 CCR 9arvt4.11 <br /> 21 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49046. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-08' <br /> ® a.ALARM LAGS ❑ b.VISUAL.INSPECTION RECORDS ❑ a TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE,AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® <br /> Personnel with USTmomturingresponatbditics are lhmiliarwidt all oflhefollowingdocuments relevautto 0reirjob duties: +9069a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(/:'heck all iliac apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 49049b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490.69a <br /> ® CALIFORNIAUNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK LAW 49049°. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: `HANDBOOK FOR TANK OWNERS - MANUAL AND 49049E <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49049s. <br /> ❑ OTHER(Specify): 490494` <br /> 490491 <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490'70. <br /> (ICC). Ilia "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,bat is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility-s best me®gement practices. <br /> Y The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> Y The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> Y Name(a)ofenntacl paeon(s)far emergencies and monitoring siartne <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional cormneuLc here or indicate how many pages with addhionm infonnmon on specific m.nit.mg proved es are atmched to this plan_ '1)0"'t <br /> Overfill : OPW 61 Overfill Droptube Set @ 95%shut off <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: l.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> b thisPlnn occurs;2.)all condition that indicate a possible mt9aaa ore mvevd�ted;and 3.)alt monitoring records aro maintained propady. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> 490'"+2 TITLE:Facilities Manager °90-J3. <br /> NAME: Kevin Selby 9 <br /> NAME: Doug Duboce °9ar0. TITLE:Designated UST Operator 49°'75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform Ilse owner/operator of any <br /> conditions that need follow-Lip action. <br /> XII."OWNER/OPERATOR SIGNATURE-' <br /> CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490"77 <br /> „ 6/1/2011 <br /> rePacssnrmo:O t.rwc 2 P99aay 3.a,aboimA s 9ro«ae: 49o-06. <br /> APPLICANT NAME(prim): /� . APPLICANT TITLE: 490-]9. <br /> E r sCa A L /! ” d i rr /Hdwur. dy' <br /> UPCF UST-D(122007)-3/4 rrww.eaddoes.org <br />