My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2007 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
16888
>
2300 - Underground Storage Tank Program
>
PR0232523
>
BILLING 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 3:16:07 PM
Creation date
11/7/2018 6:59:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232523
PE
2361
FACILITY_ID
FA0003833
STREET_NUMBER
16888
STREET_NAME
MCKINLEY
STREET_TYPE
Ave
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16888 McKinley Ave
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MCKINLEY\16888\PR0232523\BILLING 2007 - 2015 .PDF
QuestysFileName
BILLING 2007 - 2015
QuestysRecordDate
3/14/2017 6:05:19 PM
QuestysRecordID
3352980
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> R SPONSE PLAN—PAGE 1 (One form per ueaity) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2 CHANGE OF INFORMATIONINFORMATIONRm. <br /> I. FACILITY INFORMATION <br /> FACILITY rD N (Agency Use Only) <br /> BUSINESS NAME(Same a FACU- NAME) aox. <br /> c lf"rr �� <br /> BUS94M SITE ADDRESS �' CITY mew <br /> �8 N1C ctL'. Cc , <br /> IL SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplemems the emergency response plans and procedures in the facility.Hazardous Materm <br /> Business Plan. <br /> > If safe to do so,facility persomcl will take immediate measures to control o,.slop any release(c 9,salivate pump ehm-el,em.)and,if neeemery,safely remove <br /> remaining hazardous material from the UST system. <br /> > Any release to secondary,containment will be pumped or otherwise removed within a time consistent with the ability of the secondary conmimnmt system to <br /> contain the hazmrdmn material,but not greats than 30 calendar days,or soener if required by the local agency. Recovered hazsrdous materials,unles..fill suitable <br /> far,their intended use,will be managed as haswel ms waste. <br /> > Absorbent material will be used to.ordain and.Iran up manageable spills of hazardous materials. Abrenbeet materiel which has bacea a loo saturated a be <br /> efliotiwe m-which is an lengcr intended lin use will be usawgd m hazsrduua waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is nen-hazardous- Used absorbent material,rtemable, or waste,will be stored in a properly labeled and scaled container Waste material shall be disposed <br /> appropriately. <br /> ➢ Facility personnel will determine whether coy water removed from secondary ecemimmenl systems, or from clean-up activity,has been in contact with my <br /> hazardous material-If the water is ewramnmleA it will be managed a,hazardous,waste unless a waste determination in accordance with 22 CCR§66262.11 fines <br /> that a is nen-hazardous. If We water has a petroleum sheen(i.e..rainbow solos),it is conla tmal d. A Wick floating Fuson]...layer may not necessarily display <br /> rainbow colors. Wafer(hazardmss m nem-hazmdorr)fours sumps,spill containers,etc.will and be disposed to atom wale,systenw. <br /> > We will review secondary containment systems for possible deterioration if my of the following conditions occur <br /> 1. Ilazsrdoua material in cmtact wild secondary cavtainmenl isnot compatible with the material used(ex seeoedry containment; <br /> 2. td; <br /> 3. Hazardous material,older than the I mduct/wmh:stored in the primary containment system,is placed inside smondmy containment 1.treat or neutralize <br /> released prodrretlwmle,and the added material or resulting material from such a combination is nd eompatble weh secondary eoalainmenl. <br /> III. 'SPELL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clam-up equipment kept permanently m-sile is luted in the facility's Hazmdosa Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed r) fectivc equipmrnt u repaired or mptased m necessary. <br /> EQUIPMENT NOT PERMANENTLY ONSITE,BUT AVAII..WLE FOR USE IF NEEDED: Com Ictc oldy ifapplicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> 1116 RM R)0 <br /> 01. R21. R31 <br /> W1 Nix. 02, <br /> RLI. RD. ass. <br /> Rld. 014. RN- <br /> a.5. R25 Us <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)LWARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rm_ TITLE M0 <br /> NAME ast. TITLE gel. <br /> NAME aaz. TITLE ass. <br /> NAME Ret, TITLE 25' <br /> 1. V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY TIS RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional symma tmEbag ordam cdhxtion ❑fsapectim by qualified p ssa ns ❑Recalibration of espripmemt <br /> Other <br /> Ren <br /> UST Resporsu Plan(3/2007)-113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.