Laserfiche WebLink
SWRCB,January 2002 • • Page_of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer D Industry Standard ®Professional Engineer <br /> D Other(Spec6) <br /> Test Method Used: 0 Pressure D Vacuum ®Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used:Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#1-Diesel West Sump#2-Diesel East Sump# Sump# <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 34" 33" �, t <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 16" 17" MAY 02 20% <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest16" 16" r F E t,;, <br /> Electrical Penetration: - _ - <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' Water Level 26 Water Level 26 <br /> Does turbine shut down when <br /> sump se=ctsliquid(both ®Yes 0 No 0 NA ®Yes D No DNA 0 Yes D No DNA D Yes D No 0 NA <br /> product and water)? <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe <br /> shutdown? ® Yes 0 No 0 NA ®Yes D No DNA D Yes D No DNA D Yes D No DNA <br /> Was fail-safe verified to be <br /> operational?* D Yes ®No 0 NA D Yes ®No DNA D Yes D No DNA D Yes 0 No 0 NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 minutes 5 minutes <br /> test: <br /> Test Start Time: 9:30 10:30 <br /> Initial Reading(Rj): .001 .001 <br /> Test End Time: 10:00 11:00 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 minutes 30 minutes <br /> Change in Reading(RF-R[): 0 0 <br /> Pass/Fail Threshold or Criteria: .005130 minutes .005/30 minutes <br /> Test Result: ® Pass D Fail ® Pass D Fail D Pass D Fail 0 Pass D Fail <br /> Was sensor removed for testing? ® Yes 0 No 0 NA ®Yes D No D NA D Yes D No D NA D Yes 0 No D NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ®Yes D No D NA ®Yes D No DNA D Yes D No DNA D Yes D No DNA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Repairs made to both diesel STP sumps,re-glass sumps containment walls/collars,installed Bravo F-Series retrofit boot kits <br /> on all conduits and all secondary containment product lines. On both sumps#1&#2 perform test and both passed. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(')is"NO"or"AIA",the entire sump must be tested. (See SWRCB LG-160) <br />