Laserfiche WebLink
8. a. Describe the meth d[hat will be u llae to u o andlor inert the to s <br /> u- VIA <br /> 3 6 4 <br /> b. TankMping Hauler. <br /> Name W�T Cy)7 l�i1Y1 N-T <br /> Address_ 154P 5T LIN City l Uauz-v— zip <br /> 1 <br /> Phone No. 664 %Da6�) - <br /> ' Hauler Registration#(It hauled as hazardous) <br /> C. TanklPiping Disposal Site: t+,� <br /> 1 Name �' ` 4 � Yf T <br /> Address_ ft kG Lb W" City Y M_S( O p 9537, ) <br /> Phone No. i53� <br /> 1 t' <br /> PPA ID#(if transported to a permitted TSD facility) WL <br /> 9. is the sampling firm an independent third party from the contractor? YES NO)) <br /> 9a. Describe,In detail,how the soil andlor water samples)beneath the tank and piping will be obtained: <br /> so1 L L t, T"-F? <br /> 10. Describe how the excavation will be backfilled wlth suitable material upon removal: -Z` <br /> Z LSD L S <br /> X11 <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> ' b)What will be the final destination of the excavated stockpile? <br /> Tb <br /> c ntamHauler.Soil Hazardous Waste HauleL � <br /> Name �' � zi� -1 Hauler Registration# �1 LAM <br /> ` Ci ddress � 33t ��J`+ C� ty � P <br /> Phone No.( � ) <br /> EH 23 046(Revised 08113199) Page 5 <br />