Laserfiche WebLink
ATTACHMENT B HEALTH AND SAFETY PLAN <br /> 9.0 DECONTAMINATION PROCEDURES <br /> All equipment that may have become contaminated during field use will be <br /> decontaminated prior to leaving the site. Decontamination of sampling equipment will <br /> consist of a soap and water wash followed by a water rinse. Downhole drilling <br /> equipment will be decontaminated by steam cleaning. Decontamination water will be <br /> drummed and stored onsite pending laboratory analysis. <br /> 10.0 SITE SECURITY AND CONTROL <br /> Each work location at this site will be isolated using traffic cones and barricades to divert <br /> vehicular traffic. Pedestrian traffic will be diverted away from the work site by traffic <br /> cones,flagging and by personnel onsite. All vehicles left overnight will be locked and <br /> unfinished wells will be secured to limit access. <br /> 11.0 EMERGENCY SERVICES <br /> Police, fire and emergency medical services are readily available at this site through use <br /> of the 911 system. ESA personnel will have a portable phone on site for use in <br /> ' emergencies. There is also phones available within the UOP facility buildings. The <br /> nearest emergency medical facility is the Dameron Hospital located at 525 West Acacia <br /> Street in Stockton. A map to this hospital is included with this Plan as Figure 1. <br /> 12.0ER I <br /> C T FICATION <br /> I certify that I have read this Health and Safety Plan and the attached information and I <br /> understand the requirements for health and safety practices on this site. <br /> Health & Safety Manager <br /> Field Supervisor <br /> Drilling Supervisor <br /> ' Environmental Science Associates 6 University of the Pacific Site Mvestigation Work Pian <br /> June 2000 200252 <br />