My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MENDOCINO
>
1081
>
2300 - Underground Storage Tank Program
>
PR0231180
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 11:58:44 AM
Creation date
11/7/2018 7:07:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0231180
PE
2361
FACILITY_ID
FA0001143
FACILITY_NAME
UNIVERSITY OF THE PACIFIC
STREET_NUMBER
1081
Direction
W
STREET_NAME
MENDOCINO
STREET_TYPE
AVE
City
STOCKTON
Zip
95211
CURRENT_STATUS
02
SITE_LOCATION
1081 W MENDOCINO AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MENDOCINO\1081\PR0231180\REMOVAL 2000 .PDF
QuestysFileName
REMOVAL 2000
QuestysRecordDate
8/29/2017 6:20:18 PM
QuestysRecordID
3610515
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. INTRODUCTION <br /> The purpose of this Site Safety Flan is to establish requirements for protecting the health <br /> and safety of employees, contractors and subcontractors during the: <br /> REMOVAL OF UNDER GROUND STORAGE TANK and CONFIRMATION <br /> SOIL SAMPLING at UNIVERSITY OF THE PACIFIC in STOCKTON, <br /> CALIFORNIA. <br /> This plan describes hazard information and health and safety procedures to be followed <br /> by all designated field personnel during the field activities & sample collection <br /> operations. <br /> II. FACILITY BACKGROUNDIW ORKPLAN <br /> A. Address <br /> 1081 MENDICINO AVE. STOCKTON, CALIF. <br /> B. Location <br /> The site is on the south and center of the campus off of Mendicino Ave. <br /> C. Schedule <br /> Completion of an excavation in and around (1) 4400 Gallon Gasoline U.S.T.. <br /> When the tank is located and exposed it will be triple rinsed, pumped of the <br /> rinsate with a vacuum truck, inerted using dry ice (CO2), removed & loaded for <br /> transportation, soil sampling and backfilling of excavation. All activities to be <br /> conducted during daylight hours (approximately 8:00 a.m. to 6:00 p.m.). <br /> D Operation <br /> Field activities include the use of a Case 580K backhoe,jackhammer, compressor, <br /> steam cleaner, air pumps, soil sampling tools, compaction equipment. <br /> Detailed or Specific specialty equipment is used as needed for site specific <br /> conditions and are unknown at this time. <br /> III. KEY PERSONNEL AND RESPONSIBILITIES <br /> All of the field and excavation activities will be performed by Don Light of Del-Tech <br /> Geotechnical Support. The soil sampling will be completed by a field technician of <br /> Ground Zero, Inc. Soil samples collected will be forwarded to Sherwood Labs. in <br /> Hilmar, Ca. under Chain-of-Custody. <br />
The URL can be used to link to this page
Your browser does not support the video tag.