Laserfiche WebLink
I. INTRODUCTION <br /> The purpose of this Site Safety Flan is to establish requirements for protecting the health <br /> and safety of employees, contractors and subcontractors during the: <br /> REMOVAL OF UNDER GROUND STORAGE TANK and CONFIRMATION <br /> SOIL SAMPLING at UNIVERSITY OF THE PACIFIC in STOCKTON, <br /> CALIFORNIA. <br /> This plan describes hazard information and health and safety procedures to be followed <br /> by all designated field personnel during the field activities & sample collection <br /> operations. <br /> II. FACILITY BACKGROUNDIW ORKPLAN <br /> A. Address <br /> 1081 MENDICINO AVE. STOCKTON, CALIF. <br /> B. Location <br /> The site is on the south and center of the campus off of Mendicino Ave. <br /> C. Schedule <br /> Completion of an excavation in and around (1) 4400 Gallon Gasoline U.S.T.. <br /> When the tank is located and exposed it will be triple rinsed, pumped of the <br /> rinsate with a vacuum truck, inerted using dry ice (CO2), removed & loaded for <br /> transportation, soil sampling and backfilling of excavation. All activities to be <br /> conducted during daylight hours (approximately 8:00 a.m. to 6:00 p.m.). <br /> D Operation <br /> Field activities include the use of a Case 580K backhoe,jackhammer, compressor, <br /> steam cleaner, air pumps, soil sampling tools, compaction equipment. <br /> Detailed or Specific specialty equipment is used as needed for site specific <br /> conditions and are unknown at this time. <br /> III. KEY PERSONNEL AND RESPONSIBILITIES <br /> All of the field and excavation activities will be performed by Don Light of Del-Tech <br /> Geotechnical Support. The soil sampling will be completed by a field technician of <br /> Ground Zero, Inc. Soil samples collected will be forwarded to Sherwood Labs. in <br /> Hilmar, Ca. under Chain-of-Custody. <br />