My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MENDOCINO
>
1081
>
2300 - Underground Storage Tank Program
>
PR0231180
>
REMOVAL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 11:58:44 AM
Creation date
11/7/2018 7:07:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2000
RECORD_ID
PR0231180
PE
2361
FACILITY_ID
FA0001143
FACILITY_NAME
UNIVERSITY OF THE PACIFIC
STREET_NUMBER
1081
Direction
W
STREET_NAME
MENDOCINO
STREET_TYPE
AVE
City
STOCKTON
Zip
95211
CURRENT_STATUS
02
SITE_LOCATION
1081 W MENDOCINO AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MENDOCINO\1081\PR0231180\REMOVAL 2000 .PDF
QuestysFileName
REMOVAL 2000
QuestysRecordDate
8/29/2017 6:20:18 PM
QuestysRecordID
3610515
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLING PROTOCOL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil samples collected shall be <br /> representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet. If <br /> contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted within five (5) <br /> working days pursuant to California Health & Safety Code, Section 25295. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION OF SOIL SAMPLES <br /> M (Gallons) of SOIL SAMPLES <br /> < 1,000 1 per Tank Fill OR Pump End of Tank <br /> 1,000 - 10,000 2 per Tank I at each End of Tank <br /> > 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPING SOIL S <br /> TANK & PIPINAMPLES 1 Sample eve 20 lineal feet <br /> V <br /> G STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESENT IN TANK PIT <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL MINIMUM NUMBER <br /> a (Gallons) of SOIL SAMPLES SAMPLES of WATER SAMPLES <br /> < 10,000 2 from wall next to tank <br /> Single Tank 3 ends at soil/groundwater 1 <br /> interface& 1 below tank <br /> > 10,000 OR 4 from wall next to tank <br /> ends at soil/groundwater <br /> Tank Cluster 5 or more interface & 1 below each I <br /> tank <br /> SLAB PRESENT IN THE TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in order to <br /> collect the samples. (Physical removal of the obstruction will allow sampling according to the above conditions.) <br /> TANK TANK SIZE MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> N (Gallons) of SOIL SAMPLES <br /> < 1,000 3 per Tank Center and Ends OR Sides of Tani: <br /> V 1,000 - 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> > 10,000 5 OR More per Tank Ends and Middle and generally spaced <br /> along the length of the Tank <br /> EH 23 046 (Revised 08/13/99) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.