Laserfiche WebLink
• • STATE OFCAUFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> ( <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED 0 <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: G <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNERS TANK I.D.N B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) D. TANK CAPACITY IN GALLONS: 4IT!'47 <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A �1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C, ❑ to REGULAR UNLEADED 3 DIESEL ❑ 6 AVIATION GAS <br /> 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT ❑ tO PREMIUM UNLEADED 4 GASAHOL ❑ 7 METHANOL 5 <br /> ❑ Ic MIDGRADE UNLEADED ❑ JET FUEL ❑ 8 M85 <br /> ❑ 3 CHEMICALPRODUCT El95 UNKNOWN 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN REM D.BELOM <br /> D. IF(A1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> 111. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100°,6 METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR <br /> 1 RUBBER LINED 2 ALKYD LINING 3 EPDXY LINING 4 PHENOLIC LINING <br /> �❑ ❑ ❑ <br /> LINING OR ❑ 5 GLASS LINING lyl 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLEWITH100% METHANOL? YES_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ COATING F--] 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL,eIC. SPILL CONTAINMENT INST LLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES_ NO STRIKER PLATE YES NO_ DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A 671 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A 1� I BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A UV 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑1 MECW VIOL UNEIFAI( ❑2 UNE MWA5S E]3 CMIN"S INrERSTmu ❑4 ELECTROMC UNE ❑5 AWOMATIC PUMP <br /> DETEC R TEnN0 MONrO.RING LEV(DErECTOR SHUr n ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 MANUAL RECONCILIATION MONITORING <br /> ❑ 3 DMONITORING ❑ 4 IC TANK 5 TANK <br /> GAUGING ❑ MONITORING TESTING❑6 TTEESTING <br /> ❑ T <br /> CONTINUOUS MONITORING INTERSTITIAL ❑ 8 SIR ❑ 9 WEEKLY MANUAL ❑10 MONTHLY TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br /> TANK GAUGING TESTING <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PUCE) <br /> 1.ESTIMATED DATE LAST SED f)[D /YR) 2.ESTIMATED QUANTITY OF Try 3.WAS TANK FILLED WITH YES NO <br /> r �/ SUBSTANCE REMAINING ,_(L_GALLONS INERT MATERIAL ❑ ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT <br /> TANK OWNERS NAME DATE <br /> (PRINTED d SIGNANRE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> STATE I.D:# <br /> COUNTY# JURISDICTION# FACILITY# TANK# �- <br /> PERMIT NUMBER PER APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> I1y48 <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLI ON-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. F C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THPRGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) <br />