Laserfiche WebLink
• STATE OF CAUFORMA • ; tee ?®� ' <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION • FORM B � <br /> yn J. . <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM <br /> MARK ONLY 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT F-14 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 6 TANK REMOVED j <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: J4 CD <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.+ B. MANUFACTURED BY: <br /> �Anri!I <br /> C. DATE INSTALLED(MOIDAYNEAR) D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS IF A4 IS MARKED.COMPLETE ITEM C. <br /> A ❑ REGULAR <br /> 1 MOTOR VEHICLE FUEL ❑ 4 OIL 8. C. ❑ 1aUNLEA ED 3 DIESEL ❑ 6 AVIATiONGAS <br /> ❑ 2 PETROLEUM ❑ SO EMPTY ❑ 1 PRODUCT ❑ 1D PREMIUM 4 GASAHOL ^—I 7 METHANOL <br /> ❑ 3 CHEMICALPRODUCT J 95 UNIONOWN ❑ 2 WASTE ❑ 2 LEADEDD O 5 JET FUEL J <br /> ❑ 99 OTHER (DESCRIBE IN ITEM 0. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S. <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.8,ANDC.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ d SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> S. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCLAO W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ S 100% METHANOL COMPAT18LE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 5 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR 5 GLASS LINING6 UNLINED <br /> LINING ❑ ❑ UNKNOWN ❑ 99 OTHER <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE OWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED IYEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A 6)5 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U S 100% METHANOL COMPATIBLE WIFRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION p 05 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ I AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ AgNITORING ❑ OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ d AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONENKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> i.ESTIMATED DATE LAST USED(MO/DAY/YR) Z ESTIMATED OUANTITY OF 3.WAS TANK FILLED WITH YESNO <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL I ❑ ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME <br /> IPR:NTEO 8 6K:NA%RE) DATE <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BE <br /> COUNTY I JURISDICTION c LI x ' TANK 9 <br /> STATE LD.# rO <br /> PERMIT NUMBER 23�a PERMIT APPROVED BY/DATE P ATI <br /> 1 <br /> FORM 8 (7.91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS AA CURRENT FORM A HAS BEEN FILED. <br /> 00 <br /> C <br /> �O 0 /FOORRO�O BAS <br />