<br /> AND SETTING TANKS DOUBLE- WAIL TANK INSTALLATION PRODUCT, VENT & VAPOR RECOVERY PIPING TESTING PIPING SYSTEM a
<br /> POST-INSTALLATION PRESSURE TEST, AIR: PROCEDURES FOR THE PRE-INSTALLATION 1. FIRST TEST (BEFORE BACKFlLUNG TRENCHES). Q
<br /> 1. LIFTING & MOVING: WHEN UFTING OR MOVING A TANK, PRESSURE TEST SHALL BE REPEATED. THIS TEST MAY BE PERFORMED WITH OR WITHOUT HANDLING OF PIPE & FITTINGS: A. PRESSURE SYSTEM TO INCLUDE TWO GAUGES (100 PSIG MAX.)
<br /> USE PROPERLY SIZED EQUIPMENT AND LIFT BY LIFTING LUGS. PIPING AND FITTINGS ATTACHED. THE SECONDARY (OUTER) TANK TEST MUST BE APPLY 30 PSIG TO EACH SECONDARY PIPING SYSTEM. SOAP ALL PIPING ON LARGE TANKS, GREATER THAN 8' DIAMETER USE A PERFORMED A MINIMUM OF 1/2 HOUR AND ALL FITTINGS SHALL BE SOAPED. 1,TOTAL CONTAINMENT & FRP PIPE: CAREFUL HANDLING IS A MUST. PROTECT AGAINST RUNS AND FITTINGS. OBSERVE FOR LEAKS.
<br /> SPREADER BAR i0 ENSURE A LIFT ANGLE OF A7 LEAST 45 AURASION FROM SHARP OR HARD OBJECTS. IMPACT DAMAGE FROM IMPROPER B. CONNECT TWO GAUGES (150 PSIG MAXIMUM) TO PRIMARY SYSTEMS
<br /> DEGREES AT EACH LIFTING LUG. BALLASTING: ONLY THE PRIMARY (INNER) TANK SHALL BE USED WEN BALLASTING STORAGE. TRANSPORTING, LAYING OR BACKFILLING. INSPECT PIPE FOR APPLY 50 PSIG TO PRIMARY PIPING. HOLD FOR ONE
<br /> THE TANK. NEVER FILL THE SECONDARY (OUTER) TANK WITH A FLUID. DAMAGE PRIOR TO USING IN THE PIPING SYSTEM. MINUIE. RELEASE THE PRESSURE. REPEAT FIVE TIMES.
<br /> NEVER ROLL OR USE CABLES OR CHAINS AROUND A TANK. C. REPEAT STEP A. \
<br /> SET ON SMOOTH GROUND, FREE OF ROCKS AND FOREIGN OBJECTS. PRIMING: MANWAY LIDS SHALL BE PRIMED WITH POLYKEN 927. 2.PROTECTIVE
<br /> PIPE AND FITTINGS; PROTECT AGAINST DAMAGE TO THE Q
<br /> PROTECTIVE COALING WRAPPING. 2. CONTRACTOR IS TO APPLY 40 PSIG ON ALL Of THE LANES AND M �
<br /> - EXCEPTION: TANK CAN BE ROLLED UP TO 90 DEGREES ON A BURIAL DEPTH: THE BURIAL DEPTH FROM THE TOP OF THE TANK TO GROUND LEVEL LEAVE THIS PRESSURE ON THE SYSTEM THROUGHOUT THE ENTIRE \
<br /> SMOOTH, CLEAN SURFACE WHEN PERFORMING THE 'PRE- SHALL BE A MINIMUM AS SPECIFIED ON INE DRAWINGS WITH A MAXIMUM OF SEVEN CONSTRUCTION PERIOD. PRESSURE DROPS MUST BE INVESTIGATED. \
<br /> Ln
<br /> INSTALLATION" PRESSURE TEST. FEET. THE FITTINGS IN THE MANWAY ARE APPROXIMATELY 5-6 In. OFF THE TOP OF THE 3.INSTALLAIION REQUIREMENTS: INTERIOR SURFACE OF ALL PIPE AND J. THIRD TEST (AFTER BACKFILLING AND PAVING) - HYDROSTATICALLY
<br /> TANK. THIS SHALL BE CONSIDERED FOR THE SLOPE OF THE PIPING AND THUS MAY AFFECT FITTINGS MUST BE FREE FROM GIRT, SCALE, METAL, FIBERGLASS PARTICLES, TEST THE LINES AND ENSURE THAT THE LINES COMPLY WITH NFPA329.
<br /> 2. CHOCKING: TANKS ARE TO BE CHOCKED IN ACCORDANCE WITH THE TANK BURIAL DEPTH. ETC., BEFORE CONNECTING,
<br /> MANUFACTURER'S RECOMMENDATION UNTIL READY FOR 4. CONTRACTOR WILL FURNISH PENSKE A COPY OF THE LEST DATA AND
<br /> INSTALLAIION, IF WINDY CONDITIONS EXIST OR ARE EXPECTED, VENTING: THE ANNULAR SPACE BETWEEN THE PRIMARY AND SECONDARY TANK SHALL 4RRERSCA MINIMUM USTOF I%8'PER ED TWARD OPER FOOTSII SY FROM
<br /> FORD RESULTS SUPPLIED BY THE TESTING COMPANIES.
<br /> i ANCHCR TANKS USING MINIMUM 1/2' NYLON OR HEMP ROPE BE VENTED ONLY IF REQUIRED BY LOCAL JURISDICTIONS. IF REQUIRED, 2 in. FRP PIPE �Q
<br /> OVER EACH TANK AND SECURE 70 STAKES OF ADEQUATE SIZE SHALL 8E MANIFOLOED BETWEEN THE TANKS AND CONNECTED TO ON VENT RISER. PRODUCT
<br /> WIL
<br /> L KNOT MANDATORY
<br /> FOR GROUP ALL PIPING AND LOCATE AS SHOWN ON []
<br /> TO PREVENT MOVEMENT OF THE TANKS. THE PLANS, LINES ARE TO BE LAID STRAIGHT, USING FITTINGS FOR DIRECTIONAL -T ,{ co
<br /> 3. OPENINGS: ALL TANKS ARE SHIPPED WITH OUST COVERS IN EACH AND ELEVATION CHANGES. TANK/ ANCHORING SYS I EM
<br /> OPENING. DUST COVERS ARE TO REMAIN IN EACH OPENING 5.DO NOT SUPPORT PIPING WITH FORETCN OBJECTS, SUCH AS SCRAPS OF WOOD, f� li iA IV V J.. Ld Z
<br /> READY FOR THE PRE-INSTALLATION PRESSURE TEST. REPLACE PIPE, ETC. N
<br /> DUST COVER AFTER THIS TEST HAS BEEN COMPLETED. 771. TMERE
<br /> TANK TESTING GENERAL CRETE HOLD OL UNDERGROUND STORAGE TANKS MUST BE ANCHORED4. DAMAGE: IF TANK IS DAMAGED, DO NOT ATTEMPT REPAIRS. 6DRA BEDDING OF PIPING RAND ANE BACKFILL OF PIPE TRENCHES, REFER TO PATH CONCRETE HOED 'LOGS" E, "DEADMEN", IF THE LOCAL WATERTABLEWILL DETERMINE 171E URAWINC ,}2 FOR DETAILS AND SPECIFICATIONS. PROJECTS INTO THE TANK HOLE. Q LLT LLCOMPANY REP. IS TO BE NOTIFIED AND ONLY THREE TYPES OF ACCEPTABLE SOAPS. ANY OTHERS �COURSE OF ACTION THAT WILL BE FOLLOWED. APPROVED BY! PENSNE PRIOR TO CONSTRUC110N. CUTTING OF PIPE: THE TANK ACHORAGE SYSTEM SHOWN ON THE DRAWINGS IS DESIGNED FORA LEVEL OF GROUND WATER EQUAL TO THE SUBGRADE LEVEL5. SETTING: SET TANKS ON PREPARED BED WITH NO SLOPE. LOC HIGH SOAPTANKS 61Ai ARE IMPROPERLY SET MUST BE RESET. EST CONCENTRATE. i.TOTAL CONTAINMENT OR FRP PIPE: CUT WITH FINE-TOOTHED HACKSAW BLADE OR AN
<br /> SOUTH BEND LEAK DETECTOR ABRASIVE WHEEL ON A CIRCULAR POWER SAW. USE A SAW GUIDE OR 'WRAP MATERIALS:
<br /> 6, SETTING TANKS IN TANK HOLE: PLACE A 12' UFT OF BACKFILL MUST BE APPLIED USING A HAND PRESSURIZED SPRAY AROUND" TO ENSURE A SQUARE CU1 END. CUT PIPE END MUST BE WITHIN1.CONCRETE ANCHORS: PRE,AST, REINFORCED CONCRETE "LOGS', SEEOF 1/8'-3/4" GRAVEL OR 1/8"-1/2' OF STONE CRUSHINGS AROUND AND U . t/8" OF SQUARE.
<br /> COMPLETELY UNDERNEATH THE TANK BETWEEN THE RIBS AND SPECIFICATIONS FOR CROSS-SECTION WITH CHAMFERED EDGES. LENGTH AS SHOWN
<br /> UNDER END CAPS. ADD BACKFILL EVENLY AROUND THE TANKS UP 2. PRESSURE (AIR) TEST - ABOVE GRADE 2.5TEEL PIPE: CUT WIN n HANG OR POWER OPERATED PIPE CUTTER, AS ON THE DRAWINGS. GALVANIZED STEEL ANCHOR LOOPS ARE TO qH CAST INTO 'LOGS'
<br /> TO THE TOPS Of ME TANKS. A. 4-5 PSIG IN NORMAL FITTING PRACTICE. AT LOCATIONS TRENDSHOWN. PRECAST MATERIAL SHALL HAVE ACHIEVED ITS ULTIMATE
<br /> B. 2" GORM RELIEF WALVE MOD. PB-31-U.I.V. SET AT 5 PSIG COMPRESSIVE STRENGTH OF 3000 pal (28 GAYS) PRIOR TO INSTALLATION.
<br /> BACKFILL SUBGRADE AFTER PIPING AND TESTING IS COMPLETED. C. MUST HAVE TWO GAUGES; 0-10 PSIG, BOTH IN GOOD CONDITION, 3.TAPERING AND REAMING: ALL CUT FIBERGLASS PIPE ENDS MUST BE TAPERED TO
<br /> TESTED AND CAUBIRATED WITHIN A THREE MONTH PERIOD. 1-3/4 DEGREES USING ONE OF THE TAPERING TOOLS AVAILABLE FROM THE PIPE 2,HARDWARE: CABLE CLAMPS, CABLE GUIDES, GUARDS, ETC., � (n
<br /> 7. INSTALLATION W1M ALTERNATE MATERIALS: ALL ALTERNATE MATERIALS MUST D. SOAP ENTIRE TANK: AND FITTINGS. MANUFACTURER. PROTECT PIPE DURING TAPERING TO PREVENT DAMAGE TO PIPE. SHALL BE HOT-DIP GALVANIZED STEEL LLJ
<br /> }� z
<br /> BE APPROVED DY COMPANY REP. & COMPACTED TO 95Z MAXIMUM DENSITY E. IF TANKS ARE DROPPED OR IMPACTED AFTER INITIAL TEST, TANK THE FINISH TAPER SHAFOR LL BE SMOOTH, CLEAN AND FREE FROM 3- DIA T DEFECTS. 3.PROTECTIVE COATING: PRIOR TO BACKFILUNG TANKS, APPLY A GENEROUS QUANTITY �t
<br /> (ASTMD-1557-70). CONTRACTOR IS 10 FURNISH COMPANY REP, WITH SHALL BE RETESTED. THE ENTIRE TANK SHALL DE SOAP AND AIR TWE LENGTH1- /4f T FORROTHER2 SIZE PPIE RCPONSULT iPIPE MANUFACTURER'STER
<br /> CERTIFICATION OF COMPACTION FROM A REGISTERED SOIL ENGINEER, TESTED TO CHECK FOR TANK DAMAGE. IF DAMAGE HAS OCCURRED, OF ASPHALT COATING BY BRUSH TO ALL EXPOSED STEEL CABLES, LOOPS AND HARD- C/I -I
<br /> CONTRACTOR SHALL SATISFACTORILY REPAIR THE DAMAGE AND RETEST. INSTRUCTIONS. _ WARE (18 mil. MIN). l/' 1 Q
<br /> 4.STEEL PIPE ENDS ARE i0 DE REAMED. INSTALLATION PROCEDURE:
<br /> 3. AFTER INSTALLA11ON PRESSURE (AIR) TEST:
<br /> A. 4-5 PSIG AFTER BACKFILL. BACKFILL MATERIAL IS TO BE TO THE 5.13ONDING & ADHESIVE SYSTEMS (FIBERGLASS PIPET: ALL FIBERGLASS PIPE ��Y!!
<br /> TOP OF THE TANKS. SURFACES TO BE BONDED SHALL BE CLEANED Wl i SOLVENT AS SUPPLIED BY 1.(OR SIDE THE TANK HOLE OR RECEIVE THE ANCHORING "LOGS'. INSTALL SHORING
<br /> B, IF TANKS FAIL THE AIR PRESSURE TEST, CONTRACTOR WILL EFFECT PIPE MANUFACTURER. IF TAPERED SECTION IS w£1 OR MOIST, DRY WITH (OR SIDE SLOPING) IN ACCORDANCE WITH BACKFILL SPECIFICATIONS. 'll O
<br /> TANK INSTALLATION SATISFACTORY REPAIRS AND RETEST OR SHALL REPLACE THE TANK. PROPANE TORCH - DO NOT OVERHEAT OR BURN THE PIPE. IF TEMPERATURE IS 2.PUMP THE WATER OUT OF THE TANK HOLE UNTIL TANKS HAVE BEEN SET, TIED GOWN,
<br /> CONTRACTOR WILL BEAR ALL COST OR REPAIR AND/OR REPLACEMENT, BELOW 60-F 18'C), WARM ALL TAPERED SURFACES WITH PROPANE TORCH. I--
<br /> UNLESS PENSKE PURCHASED THE TANKS AND FAILURE IS DUE FITTING BELLS AND SPIGOT JOINTS SHALL BE MADE UP WITH EPDXY ADHESIVE. BALLASTED AND BACKFILLED. (10
<br /> TO MANUFACTURER'S ERROR. EPDXY ADHESIVE SHALL BE MIXED THOROUGHLY IN ACCORDANCE WITH MANU- Ld
<br /> 1. INSTALL CHAMBER FOLLOWING MANUFACTURER SPECIFICATIONS FACTURER'S INSTRUCTIONS AND SHALL BE APPLIED TO BOTH SURFACES. 3.SUFFI I EACH CABLE THROUGH BOTH
<br /> OWN ANCHOR LOOP IN THE "LOG', RESERVING
<br /> DRILL HOLES TO MATCH TANK MANWAY LID FLANGE BOLT PATTERN. 4. INTERNAL MEASUREMENTS: INSERT THE SPIGOT END INTO BELL USING A SLIGHT TURNING MOTION SUFFICIENT CABLE SQ THAT BOTH ENDS OF WE CABLE WALL BE KEPT LO S' I TOP OF THE
<br /> A. TAKE MEASUREMENTS AT FILL AND REMOTE PUMP OPENINGS (ONE HALF TURN TO A FULL. TURN IS NECESSARY) AND PUSH. TANK HOLE AFTER THE "LOGS" ARE SET. LOWER AND POSITION THE 'LOGS' IN THE TANK
<br /> 2. APPLY SEALER, SIT CHAMBER AND TIGHTEN BOLTS CONNECTING CHAMBER OF EACH TANK. HOLE, KEEPING BOTH ENDS OF THE CABLES AT THE SM OF M£ HOLE, INSTALL THE 12' C]
<br /> TQ MANWAY COVER. B. ALL RISERS, BUSHINGS, PLUGS AND PIPE CONNEC11ONS ARE 6,APPLY PRESSURE UNTIL MECHANICAL LOCK IS ACHIEVED. BACK AXIAL MINIMUM THICK BEDDING MATERIALS IN TANK HOLE. SMOOTH AND SLOPE ASPERTHE TANK
<br /> TO BE INSTALLED AND TIGHTENED PRIOR TO TEST, PRESSURE SHOULD BE MAINTAINED Qty ALL PREVIOUSLY ASSEMBLED JOINTS REDOING INSTRUCTIONS. l�►�,J\ Q
<br /> 3. AFTER TANK HAS BEEN AR TESTED TO,NFPA-30 REQUIREMENTS, INSTALL PUMP. C. TWO SETS OF MEASUREMENTS ARE REWIRED - ONE PRIOR TO TO REDUCE ME CHANCE OF SEPARATION. ,H..�_l
<br /> 4. INSTALL FILL PIPE AND TANK GAUGE RISER PIPES NEXT, KEEPING OACKPLUNG AND THE SECOND AFTER THE BACKFILL HAS 4.PROCEED SEC SETTING THE TANKS. BACKFILL BEEN WITH THE TOPS Of THE TANKS 7ZD
<br /> IN MIND THAT ALL PIPES HEIGHT SHOULD TERMINATE MTHIN THE REACHED THE GRADE. 7,INSPECT ALL FITTINGS FOR PROPER ALIGNMENT AND POSSIBLE 'BACK OUT" REFER TO SECTION 4 FOR TANK SETTING REQUIREMENTS. O
<br /> CONFINES OF TIE CHAMBER. THIS WILL KEEP THESE PIPES FROM D. DIFFERENCE SHALL NOT EXCEED ME MANUFACTURER'S LIMIT: AT THE JOINTS.
<br /> INTERFERING WITH CAST IRON MANWAY LOVER. 1/2"=4', 3/4"=8', 1-1/4"me', 1-1/2'70' S.INSTALL THE CABLE GUARDS, CABLES GUIDES, ETC.. FURNISHED BY THE .TANK MANUFACTURER �-"
<br /> 5. INSTALL CONDUIT AND PIPING AS REQUIRED USING TOTAL CONTAINMENT 5, AFTER BACKFILUNG ANIO PAVING, PRECISION TEST ALL TANKS USING B.FCLLOW PIPE MANUFACTURER'S RECOMMENDATIONS IT IS
<br /> pN GLARE TIME BEFORE CAUTION: ALL SETS OF CABLES ON A TANK MUST BE TIGHTENED EQUALLY TO J i
<br /> SEALS TO SEAL CHAMBER AT CONDUIT AND PIPE ENTRIES TANKNOIOCY TESTING CO. GAIL t-800-888-8583 AND REQUEST DISTURBING JOINTS OR TESTING. IF IT IS ANTICIPATED THAT THE TEMPERATURE WILL AVOID TANK DEFORMATION -
<br /> 6. ALL PIPING SHALL BE SE T CONDUIT
<br /> BY A MIN. OF 6', INCLUDING DROP BELOW 60F (16-C) AT ANY TIME DURING THE CURING PROCESS, HEAT "J
<br /> CONDUIT. PENSKE RATES. SHALL BE APPLIED TO THE JOINTS, ONLY CHEMICAL OR ELECTRICAL DEVICES SAFTER ALL TIE-DOWNS ARE COMPLETED, BEGIN THE BACKFILL PROCEDURES TO THE TOPS .¢
<br /> 7. TEST PIPING SYSTEM AS REQUIRED. • THE CONTRACTOR SHMLL FURNISH A STATEMENT WHICH WILL DOCUMENT RECOMMENDED BY THE PIPE MANUFACTURER To
<br /> ACCEPTABLE FOR THIS PURPOSE. OF THE TANKS F--
<br /> THE .ABOVE TESTING REQUIREMENTS AND ALSO INCLUDE THE DATE NO OPEN FLAME OR SPARKING DEVICES ARETO BE USED.
<br /> 6. BACKFILL AROUND CHAMBER AREA WITH INERT SAND OR SMALL GRAVEL MATERIAL OF THE TEST WAS PERFORMED, CERTIFYING COMPLIANCE WITH NFPA CODE /30. - - Z
<br /> 9.MREAOEU JOINTS. THREADED JOINTS MUST BE REAMED AND HAVE GLEAN yr(
<br /> 9. INSTALL CAST IRON GRADE MANWAY SO THAT NO TRAFFIC LOADS ARE • CONTRACTOR SHALL FURNISH PENSKE A COPY OF THE TEST DATA CUT, PERFECT THREADS AND BE MADE UP WITH NON-HARDENING JOINT 0
<br /> TRANSFERRED TO CHAMBER. COMPOUND (INSOLUBLE IN PETROLEUM PRODUCTS) APPROVED BY COMPANY
<br /> I0. PLACE THE 32' O.D. COVER SO THAT THE (2 '10 3/4' OPENINGS LME AND RESULTS SUPPLIED BY THE TESTING COMPANIES. REPRESENTATIVE. CONCRETE SP E C V-/I IF
<br /> I C ATI ON S Q
<br /> UP OVER THE TOPS OF THE FILL AND VAPOR RECOVERY OPENINGS. • UNDER NO CIRCUMSTANCES IS ANY TANK TO BE FILLED WITH WATER, PRODUCT APPROVED JOINT COMPOUND: jr'
<br /> 11. INSTALL BOTH 10 3/4' MANHOLE COVERS, LEAST THREE-QUARTERS OF ITS DEPTH. CILBARCO PIPE JOINT COMPOUND J
<br /> OR ANY OTHER LIWI© UNLESS IT IS FULLY SUPPORTED BY BACKFILL TO AT RECTORSEAI
<br /> 7. ALL CONCRETE TO BE 3500 PSI MIN.PENSKE
<br /> DAY COMPRESSIVE STRENGTH) ^„
<br /> CONSTRUCT SLABS ACCORDING TO PENSKE FUEL ISLAND PLANS.
<br /> PERMAIEX 57
<br /> 13. ALL PIPING & RISERS (STEEL) SHALL BE PRIMED & TAPPED, IF - J
<br /> IN CONTACT WITH FILL MATERIAL. OR APPROVED EQUAL { Cil
<br /> 9.FIBERGLASS TO STEEL PIPE CONNEC11ONS: FIBERGLASS THREADED END 2. ALL CONCRETE TO BE REINFORCED AS PER PLANS. LD 4
<br /> 14. ALL OPENINGS ON THE CONTAINMENT SUMPS SHALL BE SEALED ADAPTERS ARE TO BE THREADED INTO STEEL PIPE OR. FITTING BEFORE
<br /> & FLUID TIGHT. PRODUCT, VENT & VAPOR RECOVERY PIPING BONDING ONTO THE PIBERGLASS PIPE.
<br /> - IO.S'JANG JOINTS! SHALL BE FACILITATED USING NON-METALUC FLEX CONNECTORS,
<br /> [ON
<br /> TERIALS: ALL PIPES, FITTINGS, RISERS, WRAPPING MATERIALS, ETC., SHALL MPIPE WRAPPING: ALL UNDERGROUND STEEL PIPE AND FITTINGS SHALL BE.. FIELD -
<br /> FURNISHED AND INSTALLED BY THE CONTRACTOR. SPECIFIED MATERIALS NOTED PRIMED AND WRAPPED. WRAPPING MATERIAL SHALL BE 35 mil. POLYETHYLENE NOTE! !
<br /> THIS SPECIFICATION AIND/OR ON PLANS WILL BE FURNISHED BY COMPANY. TAPE 'POLYKEN 930' MANUFACTURED BY THE KENDALL COMPANY (OR EQUAL APPROVED DY
<br /> L PIPE RUNS ARE TO DE TOTAL CONTAINMENT OR ERP PIPING SIZED IN COMPANY REP. ). WRAP OVERLAP SHALL BE ONE-HALF WIDTH OF WRAPPING MATERIAL
<br /> CORDANCE WITH PLAN'S. WRAP 1-1/2' AND 2* FITTINGS WITH POIYKEN 900 (12 mil.) WITH A 60Y. OVERLAP. IN -�
<br /> DIFFICULT AREAS, POLYKEN 931 CAN BE USED BEFORE WRAPPING WITH POLYKEN 900. PRIMER . CONTRACTOR MUST CALIBRATE DISPENSERS USING
<br /> SHALL BE POLYKEN 927 (ABOVE 40F) OR POLYKEN 919 (ABOVE 10F).
<br /> DOUBLE - WALL TANK INSTALLATION EN USING TOTAL CONTAINMENT PIPING SYSTEM, INSTALL IT EXCEPTION; STEEL PIPING INSIDE SUMPS WALL NOT BE WRAPPED. 5O GALLON CALIBRATION TANK
<br /> PER THE MANUFACTURER'S SPECIFICATIONS. 12.5ETTING & BEDDING PIPE: A 6' MINIMUM DEO OFBACKFILL MATERIAL IS TO BE PLACED IN
<br /> FIBERGLASS PIPE: PAPE FITTINGS TO BE UL APPROY£0., NON-METALUC FOR ALL PIPING TRENCHES. SMOOTH, COMPACT ANDSLOPE BEDDING MATERIAL 70 ALLOW A
<br /> GENERAL REQUIREMENTS: EOR DWBIE WAIL TANK, ALL THE SPECIFICATIONS FOR SINGLE DERCROUN0 PIPING OIF PETROLEUM PRODUCTS. SLOPE OF 1/4" PER FOOT TOWARD THE TANKS. IN EXTREME CONDITIONS, 1/8' PER FOOT • THE CONTRACTOR WILL COMPLETE, SIGN AND
<br /> WALL TANK INSTALLATION SHALL BE FOLLOWED, IN AODIIION TO THE REQUIREMENTS USTED MAY HE USED If APPROVED BY COMPANY REP.
<br /> " 13.T0 TAI CONTAINMENT BELOW, APPROVED FIBERGLASS PIPE: 1 PIPING MUST DE INSTALLED AS PER MANUFACTURERS INSTRUCTIONS SUBMIT, TO THE PENSKE PROJECT MANAGER,
<br /> CIBA GEIGY ALL FITTINGS WILL BE AS MANUFACTURED BY TOTAL CONTAINMENT A STATE SPECIFIC TANK INSTALLATION FORM.
<br /> HANDLING: ME CONTRACTOR IS RESPONSIBLE FOR OFF-LOADING THE TANKS FROM THE DUALOY-3000 PIPE SYSTEM
<br /> DELIVERY VEHICLE. A CRANE OR BACKHOE OF SUFFICIENT LIFTING CAPACITY MUST BE USED. A.O. SMITH INLAND INC.
<br /> RED THREAD IK PIPE SYSTEM • CONTRACTOR WILL SUPPLY TWO BOUND COPIES
<br /> PRE-INSTALLATION PRESSURE TEST, AIR: -
<br /> PRIMARY (INNER) TANK TEST: TIGHTEN ALL TANK FITTINGS. LOCATE A PRESSURE GAUGE NON-METALLIC FITTINGS ARE TO BE THOSE MANUFACTURED BY THE SUPPLIER OF A COMPLETE REPORT WHICH MEETS STATE Z
<br /> IN THE VENT/MONITORING FITTING IN THE SECONDARY (OUTER) TANK. LOCATE A SECOND OF THE PIPE BEING USED. REQUIREMENTS FOR ANY TANK REMOVALS. CHECK O z
<br /> PRESSURE CAGE AT A FITTING IN THE MANWAY AND CONNECT THE AIR PRE55URE TO THIS WITH THE PENSKE PROJECT MANAGER FOR DETAILS
<br /> SAME FITTING. PRESSURIZE THE PRIMARY (INNER) TANK TO A MINIMUM OF 4 PSI, MAXIMUM INSTALL PIPE AND FITTINGS IN ACCORDANCE WITH MANUFACTURER'S DOUBLE - WALL LINE INSTALLATION
<br /> 5 psi. MONITOR THE PRESSURE GAGES A MINIMUM OF 1/2 HOUR. INSTRUCTIONS. OF THIS REPORT.
<br /> 2. STEEL PIPE: (BLACK IRON FOR RISERS AND ABOVEGROUND VENT PIPE) 1, CONTRACTOR WILL USE 'TOTAL CONTAINMENT SYSTEM' FOR DOUBLE-WALL PIPING.
<br /> SECONDARY (OUTER) TANK TEST: LEAVE THE PRESSURE ON THE PRIMARY TANK. USING A SCHEDULE 40(ASTM A-120) STEEL PIPE TOTAL COtINC. Q
<br /> FLEXIBLE AIR HOSE MANIFOLD. CONNECT THE AIR PRESSURE HOSE FROM THE PRIMARY TANK 250,# RAILROAD UNIONS 306 COMMERRCECE DRIVE
<br /> ENT D
<br /> 610)-52244-9274
<br /> TO ME SECONDARY TANK. THIS MANIFOLD HOSE SHOULD BE CONNECTED TO THE 150,# MALLEABLE IRON FITTINGS ( 79341
<br /> VENT/MONITOR FITTING THAT DOES NOT CONTAIN THE AIR PRESSURE GAGE, CLOSE THE (610)-
<br /> VALVE TO THE PRIMARY TANK AND DISCONNECT THE AIR SUPPLY, PRESSURIZE THE 2. DOUBLE WALL F.R.P. PIPING WILL BE USED IF 'THE TOTAL CONTAINMENT SYSTEM'
<br /> SECONDARY TANK BY OPENING THE VALVE IN ME MANIFOLD SYSTEM. SOAP THE EN11RE - IS NOT APPROVED FOR USE IN THE AREA OF THE PROJECT.
<br /> TANK ANO.ALL FITTINGS.