Laserfiche WebLink
RXIR <br /> --- _9 —SIGN--, EARTH PANT ER CURB FACE �r �_ �� II JE _ \�_ \� -1_. y <br /> n 1L <br /> -- <br /> I ( ..—�,.,....................... tit6 9 1/?,i -- --_— --_::L _ ,DEI <br /> 1 <br /> x .—_ x -- -- - �.z- - NA _ _ _ _ G 1 <br /> - --- - <br /> l Y, l ,"--....""- . - x - - �, - - - GRXR <br /> LA s <br /> 136, GATE J - {,x �u..........u. {'� _��A -x_t104'_h 1/2 --- x ----- RD � , <br /> f J _ _ { <br /> POWER �— ' A- <br /> / 1362 GATE - - <br /> I, ff i 1 Q"i n I 1 <br /> GUY WIRE <br /> l <br /> .SCALE C'=20' <br /> I a - - -- <br /> 20 10 0 20 40 so 8C <br /> GN I_J <br /> ' i E REMOVED <br /> 4 WIDE GRAPHIC SCALE J <br /> -EEt <br /> CONCRETE STRIPS— DIER RB H <br /> ^fir ( OFFICE AEA E REMAINS I x <br /> _ P.G.&E. GAS <br /> ii <br /> METER <br /> I / � <br /> OFFICES <br /> FUTURE x ; ' <br /> R3 PE NSKE I E�� � 1 <br /> R8 TERp� <br /> BOX. GAS <br /> ITl r I R7 r t 4X4 UPRIGHT POSTS <br /> r� III j� lJ l__E I ' v A HOusF DIB i - �j ,./HANDTRIJCK ,STORAGE AREA / <br /> _ l <br /> �0EBE _ IS. dED <br /> — -7 fi pOCE I <br /> K } EX6 WOODEN G.H.PO'vVER <br /> _ PARKING BUMPERS - <br /> GENERAL CONSTRUCTION NOTES <br /> Gi CONTRACTOR SHALL VERIFY THAT PENSKE WILL PROVIDE STANDARD <br /> OVERSPILL CONTAINMENT BOX CNI-239 WITH ADDITIONAL BAFFl_E CNI- <br /> NT 1 260 AND DRAIN CNI-278 (STANDARD REQUIREMENTS). <br /> 1 <br /> r� r �- <br /> Jj ti tt /✓ / 7 % 02 CONTRACTOR SHALL BE EXTREMELY CAREFUL DURING ALL EXCAVATION <br /> J <br /> 7 � I -P� NI ��V `� OPERATIONS TO AVOID DAMAGE TO EXISTING UNDERGROUND LINES. <br /> I R7 / _ / i / / / "DIG ALERT' AND All UTILITIES WILL BE NOTIFIED APPROPRIATELY <br /> PRIOR TO ANY EXCAVATION. <br /> i 0 BE <br /> UcJ H E D <br /> GAS 7r �. / G3 SOIL LAB CONSULTANT SHALL BE RESPONSIBLE FOR PROVIDING AND <br /> REPORTING DOCUMENTATION FOR AQMD RULE 1166, CONTRACTOR MUST <br /> _ __ HOSE 1 7 / FOLLOW THEIR DIRECTION WHEN SOIL IN EXCESS OF RULE 1166 LEVEL <br /> SAWCUTf (?(Q 7 / IS DETECTED AND FOLLOW THE NECESSARY PRECAUTIONS & MAKE THE <br /> NECESSARY NOTIFICATIONS. <br /> Gh PENSKE SHALL BE RESPONSIBLE FOR THE DISPOSAL & TREATMENT OF <br /> �� ALL CONTAMINATED SOILS. CONTRACTOR SHALL BE RESPONSIBLE FOR <br /> % / A THE EXCAVATING AND SEGREGATION OF ALL SOILS, SUPPLYING <br /> } <br /> VISQUEEN FOR SOIL, AND MAKING SURE SOIL IS COVERED AT ALL <br /> I TIMES. <br /> G6 THE ENTIRE CONSTRUCTION SITE SHALL BE FENCED, COVERED WITH <br /> SCREEN MATERIAL AND SECURED AT ALL TIMES. THE TANK EXCAVATION <br /> FENCED DURING EXTENDED PERIODS AWAY FROM THE PROJECT, THE <br /> FENCE SHALL BE A MINIMUM OF 6' HIGH AND SURROUNDING THE F_NTIRE <br /> TANK EXCAVATION. <br /> CURB � ! ' CONCRETE j G7 RECONNECT AND/OR REPAIR ANY DAMAGED UNDERGROUND LINES CAUSED <br /> `I DIKE BY CONSTRUCTION ACTIVITIES, <br /> C SERVICE(- \ / p BATH I ��/ G8 REROUTE WATER, AIR, TELEPHONE LINES, OR ANY UNDERGROUND <br /> '1 <br /> FUTURE JEI� y �CE UAYS i ROOMS / UTILITIES/PIPING THAT INTERFER WITH CONSTRUCTION ACTIVITIES. <br /> 1,I CATCH BUILDING <br /> -D III I"� f� I �-` tt Citi R7 � G9 ASSURE CANOPY DRAINS ARE CLEAR, OPERATIONAL, AND POSE A <br /> BASIN B 1.1 LD I N 7 LG /✓ PROBLEM AFTER COMPLETION OF PROJECT. <br /> REMOVAL/DEMOLIT,i3ON <br /> 010 ALL EXISTING MONITORING WELLS ARE TO BE PROTECTED AT ALL <br /> I I % y - I AC ' ,' !n'� R1 EXISTING ABOVE GROUND DIESEL TANK TO BE REMOVED BY OTHERS.. TIMES, A NEW COLOR CODED WELL COVER IS TO BE REINSTALLED IN <br /> I' `� I } % ALL AFFECTED CONSTRUCTION AREAS. <br /> U 01 SHEDI <br /> I .a 3S ELECTRICAf. l 7/ R3 DEMOLISH, ENTIRETY REMOVE AND PROPERLY DISPOSE OF ql_L OF <br /> m <br /> Ail <br /> -SEW'ER PANELS ; BUILDING "A' AS 'INDICATED. Git CONTRACTOR SHALL BE EXTREMELY CAREFUL DURING ALL EXCAVATION <br /> in Cc ./ J/, � / R4 OPERATIONS TO AVOID DAMAGE TO EXISTING UNDERGROUND LINES. <br /> \, l \� j DEMOLISH, ENTIRELY REMOVE AND PROPERLY DISPOSE OF A PORTION OF ALL OF "DIG ALERT" AND ALL UTILITIRES 'WILT. BE NOTIFIED APPROPRIATELY <br /> xY __ ._.__- BUILDING "C' AS INDICATED. PRIOR TO ANY EXCAVATION. <br /> - i� <br /> t 30 _GATE. _ � I __ x - <br /> tt 4 3 �1�_ lx ��� 'oo�— ��- R5 NO WORK IS TO DE GONE ON BUILDING "B" C12 TANK HOLES, REGARDLESS OF DEPTH, SHALL BE FENCED OFF WHEN <br /> •••••• ••••••++ -- x x -- x -- r // UNMANNED BY CONSTRUCTION PERSONNEL. THIS PRECAUTION SHOULD BE <br /> /4 - +Jf76 7 f4 -- �u"I••°•o �r EXERCISED ESPECIALLY WHEN THERE IS NO ACTIVITY. AS IN THE <br /> ,! �lrj-- - - -';a,, •'• u + R6 EXISTING OFFICE TRAILER TO BE REMOVED BY OTHERS. CASE OF END-OF-THE-DAY WORK COMPLETION. IN ADDITION, <br /> - -- —�-- -- —"' = 'O•.• / CONTRACTOR SHALL PLACE BARRICADES AT INGRESS AND EGRESS AREAS. <br /> 4- <br />