Laserfiche WebLink
PUBLIC HEALTH SERVICES ,Q1.640�a <br /> SAN JOAQUIN COUNTY r. , <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Ernest M. Fujimoto, M.D., M.P.H., Acting Health Officer <br /> 445 N. San Joaquin Street • P.O. Boz 388 0 Stockton, CA 95201-0388 <br /> (209) 468-3420 <br /> 3 0 <br /> eb r <br /> 3 z'co.k HUV <br /> TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAgk,,T NKS '995 <br /> San Joaquin County Public Health Services-Environmental Health Division (PHS-E) j� 1 9 <br /> lished the <br /> following guidelines to assist you in the completion of your construction project. The gut the <br /> construction and monitoring criteria necessary to complete our review of your proposed undergrou storage <br /> tank (UST) system. <br /> 1. SUBMITTAL OF PLANS <br /> OIL a. Submit 3 complete sets of detailed drawings in non-erasable print to the Environmental <br /> Health Division. Upon approval, one set will be retained by the departrhent and the other <br /> �� two will be returned. <br /> / b. ) Include equipment and material specification sheets and manufacturer's brochures describing <br /> ��� operating and monitoring systems and listing numbers or other evidence of a nationally <br /> recognized testing organization approval. <br /> c. Include detailed monitoring and response plans for facility. <br /> mk d. The drawn to scale plat plan should illustrate the location of all existing and proposed <br /> structures, including existing UST(s). <br /> Srwoeass. e. The plans should include a cross sectional diagram of the tank and piping system including <br /> secondary containment, overflow protection equipment, and extension of all pipes and/or <br /> ports from subgrade to finish grade. <br /> 2. PLAN REVIEW AND OPERATING PERMIT FEES <br /> �tmZq� c H@�K a. New facility plan review fee of4624.00 (8 hour minimum per facility), $170.00 fee per tank, <br /> plus $56.00 state surcharge fee per tank is due at time of plan submittal. <br /> b. New installation of additional tank at an existing facility is $624.00 plan review fee (8 hour <br /> minimum per facility)plus$170.00 fee per new tank,and$56.00 per tank state surcharge fee. <br /> C. It should be noted that a $624.00 plan review check fee required for each submittal allows <br /> for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br /> plan review, meetings, inspections, phone or office consultations will be billed to the <br /> applicant at a rate of$78.00 per hour. <br /> d. The maximum review time for UST installation plans is 40 working days._ A preliminary <br /> review will be conducted by the PHS/EHD within 20 working days of submittal date to <br /> identify any gross plan deficiencies. <br /> e. If gross deficiencies are identified, the plans will be returned with checklist identifying plan <br /> deficiencies. <br /> f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br /> submitted to have review completed within 10 working days of submittal date. <br /> A Dkkion of San Joaquin County Health Care Services <br />