My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
1950
>
2300 - Underground Storage Tank Program
>
PR0504240
>
INSTALL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 9:26:42 AM
Creation date
11/7/2018 7:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0504240
PE
2361
FACILITY_ID
FA0006136
FACILITY_NAME
QUICK TRUCK REPAIR
STREET_NUMBER
1950
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15308006
CURRENT_STATUS
02
SITE_LOCATION
1950 E MINER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MINER\1950\PR0504240\INSTALL\1995 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25. PIPING INFORMATION <br /> � PIPING INFORMATION TANK# TANK# TANK# TANK# <br /> DISTANCE from / <br /> DISPENSER to TANK I� <br /> MANUFACTURER EN V//LQ yL, 6 aen Lie &,p <br /> Cj�,w V/`z40i <br /> SYSTEM TYPE ' /Z(�5 rju/Z C-S -^ C-G `^I//{' <br /> CONSTRUCTION " r, .w y Gr <br /> MATERIAL "* E G *- 5 <br /> LEAK DETECTION SYST EXoe - <br /> 100% METHANOL COMPATIBILITY with <br /> FRP <br /> CORROSION PROTECTION <br /> ' System Type; suction, pressure, and gravity <br /> Construction: single-walled, double-walled, tined-trench, etc. <br /> Material Type; steel-iron, stainless-steel, fiberglass, etc. <br /> 25. 6aC Piping (cross-sectional diagram, including connections to tank and dispensers). <br /> E5 Double wall piping or _ Secondary containment (Trench Liner, etc.) <br /> (1) Product tine (leak detector or automatic shut-off on <br /> pressurized piping). <br /> '!A (2) Vent and vapor recovery lines if not designed to <br /> prevent the entrance of standing fluids. (Ball float valve) <br /> Og!� (3) Manways and other single walled pipe fittings on a <br /> double-walled tank, if not designed to prevent the <br /> entrance of standing fluid. <br /> 27. /g_/ State water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 28. Plan review and operating permit fees paid. <br /> 29. E Monitoring and Response Plans submitted. <br /> Proof of financial responsibility on file. <br /> 31. what is the approximate depth to ground water- Jn//G <br /> (include source of information - borehole logs, monitoring wait data, water <br /> studies, etc.) <br /> /i 7 �Y A 77iLt/to� ) �.sy. ✓if`pcJ <br /> L <br /> 32. ✓ Total number of tanks on site after installation- 2 �DOu l3 Li? w5't-ee, F',Sag� A55 GLAZ <br /> 33. ✓ Any existing tanks to be removed or abandoned? YES L ) NO Pj If yes, submit State water Resources <br /> Control Board "Facility Permit (B)" application form. <br /> 34. Responsible party(ies) shall submit a -Letter of Commitment- prior to the <br /> installation of new tanks. (Applies to sites with documented soil and/or groundwater contamination) <br /> 35. Xg-1, County/City Fire District and Building Department notified. <br /> 36. REMARKS <br /> --------------------••____..-..-----------.-_--_-------------_-----------------------------_----------------_-_------------- <br /> --------------------••____._-.----------.-..----------.--.----------------__---------.---.._.-----------_------------.--.-.- <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.