Laserfiche WebLink
aOARO OF TRUSTEES SAN JOAQUIN LOCAL HEALTH DISTRICT <br /> JamesCulDerlaon, Pies. SERVINO <br /> Paulcla E. vannuccl, Secy. City of Lodi <br /> Anthonalte Van Spronsen 1601 East Hazelton Avenue, P. O. Box 2009 San Joaquin County <br /> Earl Pimentel Stockton, California 95201 City of Escalon <br /> Fern Buphee City of Manteca <br /> Daniel L. Flores 209/tiS, - , City of Ripon <br /> John 0. Mast, M.D. City of StoctlonCity of Tracy <br /> William J. Wade Jopl Khanna, M.D., M.P.N., District Health Officer San Joaquin County <br /> Mary Anna Love Sen Joaquin County <br /> facility NamegQC/ <br /> Address /063 MOFi=AT_^P>/V/) <br /> Date7/0 Inspector <br /> MONITORING ALTEP.NP.TIVC 87 000 <br /> Limited to underground storage tanks which have infrequent inputs and withdrawals and <br /> where the liquit! level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> I,�'Annual precision test on tank and piping. <br /> t"`fTank gauging performed as follows: <br /> r/ Tank must be capable of being secured to prevent unauthorized inputs and <br /> /withdrawals. <br /> y Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> t/ Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> V If liquid level varies more than 1% of the tank volume or 5 gallons , which <br /> ever is less , between measurements , an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours , as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. r/q <br /> Precision test(s) must be performed by / /(a/ amid results submitted to this <br /> office within 30 days of the test. <br /> Tank gauging must be started immediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> EH 23 002 4/86 <br />