Laserfiche WebLink
AML <br /> NDERGROUND STORAGE TANK <br /> RESPONSE PLAN-- PAGE I (One form per facility) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION Rol. <br /> I. FACILITY INFORMATION <br /> FACILITY TD# (Agenc,Use Only) 1 <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> Rale 's Aisle 1 #356 <br /> BUSINESS SITE ADDRESS 103. 13USTNFSS SITE CITY 104, <br /> 4219 Morada Lane Stockton <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements die emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> Y If safe to do so,facility personnel will take immediate measures 10 control or stop any release(e.g.,activate pump shut-off,ctc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> D Any release to secondary containment will be pumped or otherwise removed within a time consistent with die ability of the secondary containment system to <br /> contain the hazardous material,but not greater that)30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will he managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> D Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> liazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen (i.e.,rainbow colors), it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storin water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact wits secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment; <br /> 3, Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC IIIAINTENANCE:Spill control acid clean-up equipment kept permanently on-site is listed in die facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE 1F NEEDED: (Complete onl J if licable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RID. R2o, - Rao, <br /> R11. R21. R31, <br /> Rig. Rae. Rax. <br /> R13. M3, TW <br /> RI4. R24. R34. <br /> R15. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)JS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rao. TITLE RSO. <br /> Frank Durazo Store Director <br /> NAME R41. TITLE R51. <br /> Roger Priest Asst.Store Director <br /> NAME R42, TITLE R52. <br /> Alicia P#eisle Aisle 1 Manager <br /> NAME R43. TITLE X53• <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTIIORI7ED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> [:11.ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ❑2. INSPrCTION BY QUALIFIED PERSONS ❑3. RECALIBRATION OF EQUIPMENT RM <br /> 0 99. OTHER(Specify):Aisle 1 Management will immediately contact Service Station Systems, Raley's site R61. <br /> Designated Operator and Full Service Provider,to clear all monitoring equipment ISD alarms and <br /> repair/replace any necessary related operating hardware on site. <br /> UN-022B-113 www.unidocs.org Rev.04102AS <br />