Laserfiche WebLink
JUL-24-2a88 16 36 Service Station Systems 488 938 8686 P.03 <br /> Monitoring System Certification-Paoof3 <br /> Site Address: 4219 Morada Ln. Date of Testing/Servicing: 7122/08 <br /> D. Results of Testing I Servicing <br /> Software Version Installed: 327.04 . <br /> Corn lete the foliowin checklist: <br /> tH Yes 0 No" is the audible alarm operational? <br /> tg Yes 0 NO is the visual alarm operational? <br /> tS Yes ❑ No* Were all sensors visually inspected, functionally tested, and confirmed operational'? <br /> l8 Yes 13 No" Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation'.) <br /> 0 Yes ❑ Noy` If alarms are relayed to a remote monitoring station, is all communications equipment(e.g. modem) <br /> a N/A operational? <br /> l$Yes ❑ No" For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) iB Sump/Trench Sensors; t$ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? t8 Yes O No <br /> :B Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> 0 N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? if so, at what 2ercent of tank capacity does the alarm trigger? 90 % <br /> ❑ Yes* M No Was any monitoring equipment replaced? if yes, identify specific sensors, probes, or other equipment replaced <br /> and list the manufacturer name and mode! for ail replacement parts in Section E, below. <br /> 11 Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? ("Check a//that apply) <br /> [Z Product;l8 Water. If Zes, describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? (Attach set-up reports, if applicable.) <br /> M Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> ~" In Section E below, describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Prem and Diesel share the same annular sensor. All UDC's, STP, Fill and Vent sumps have <br /> Brine sensors. <br /> Vent sump sensor testedlpassed <br />