My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
COMPLIANCE INFO 2007 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:08:30 PM
Creation date
11/7/2018 7:59:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2008
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
RALEYS FUEL STATION #356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MORADA\4219\PR0524617\COMPLIANCE INFO 2007 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2008
QuestysRecordDate
6/6/2018 3:37:29 PM
QuestysRecordID
3911139
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certitication-Page 2 of 3 <br /> Site Address:-421 I Morada Ln Irate of TestinWServicing: 7=08 <br /> A. Results of Tcsting/Servicing <br /> Software Version installed. 327.04 <br /> Complete the(Ono wiag checklist: <br /> m Yes 1 ❑ No Is the audible alarm opera onal? <br /> Q Yes Cl No* Is the visual alarm operational? <br /> Q Yes a No* Were all sensors visually ins ected,fanctionally tested,and coafirstiedratioral? <br /> CE Yes ❑ NO Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper o ration? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g. modem) <br /> M NIA rational? <br /> M Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping w0wdary containment <br /> 0 NIA monitoring system detects a leak,fails to operate,or is electrically disconnected? If ym which sensors initiate <br /> positive shut-down? (Check all that apply) CE Sump/Trench Sensors; M Dispenser Containment Sensors. <br /> Did yqu confirm positive shut-down due to leaks and sensor fadureldisconnection? M Yes O No <br /> ll Yes 0 No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> 1 0 N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? 90 % <br /> 0 Yes* I ti No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> li Yes* ❑ No Was liquid found"inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> Q Product;m Water. If yes,describe causes in Section E,below. <br /> tI Yes ❑ No* Was monitoring system set-up reviewed to ensure ? Attach set-ge reports, ff a livable <br /> M Yes 1 0 No* Is all monitoring CqWpmcnt o oral per manu6acttinesspecifications? <br /> *In Section E below,describe hour and when these denciencies were or will be corrected. <br /> E. Comments: Prem and Diesel share the same annular sensor.All UDC's, STP, Fill and Vent sumps have <br /> Brine sensors. <br /> Vent sump sensor testedlpassed <br /> 4 <br /> 1 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.