My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
COMPLIANCE INFO 2007 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:08:30 PM
Creation date
11/7/2018 7:59:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2008
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
RALEYS FUEL STATION #356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MORADA\4219\PR0524617\COMPLIANCE INFO 2007 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2008
QuestysRecordDate
6/6/2018 3:37:29 PM
QuestysRecordID
3911139
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certifk ation-Page 2 of 3 <br /> Site Address: X4219 Morada Ln.0 Date of TestinglServicing: 71220 <br /> D. Results of Testing/Servicing <br /> Software Version installed. 227•04 <br /> Cam Tete the followia2 checklist: <br /> Q Yes 0 No* Is the audible alarm operational? <br /> M Yes 13 No* Is the visual alarm operational? <br /> a Yes 0 No* Were all sensors visually inspectK.ftinctionally tested,and confirmedoperational? <br /> M Yes 0 No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their E2pE operation? <br /> 0 Yes 0 No* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g. modem) <br /> M N/Aoperational? <br /> } M Yes D No* For pressurized piping systems,does the turbine automatically shut down if the piping swondary containment <br /> i 0 NIA monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive sbut-down? (Check all that apply) m Sump/Trench Sensors; Q Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaps and sensor failure/disconnection? Q Yes m No <br /> M Yes o No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(Le_no <br /> I 0 NIA mechanical overfill prevention valve is Installed), is the overfill warning alarm visible and audible at the tank <br /> fill iat(s and operating proWLY? If so,at what percent of tank capacity does the alarm tri er"? 90 °/* <br /> 0 Yes* m No Was any monitoring equipment replaced?If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacum name and model for all 2Lljoement parts in Section E,below. <br /> Q Yes* o No Was liquid found"inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> CL Product;a water. If yes,describe causes in Section E,below. <br /> M Yes 13 No* Was monitoring system set-up reviewed to ensure proper satfinp? Attach set-up re lica6le. <br /> M Yes 0 NO Is all monitoring equipment=oral per gas'sspecifications? <br /> *In Section E below,describe how and when these deflcienekes were or wig be corrected. <br /> E. Comments; Prem and Diesel*bare the same annular sensor.All WDC's, STP, Fill and Vent sumps have <br /> Brine sensors. <br /> Vent sump sensor testedlpassed <br /> i <br /> 's <br />
The URL can be used to link to this page
Your browser does not support the video tag.