Laserfiche WebLink
Monitoring System Certification-Page 2 of 3 <br /> Site Address: 4210 Morsda Ln.@. Date of Testing�iciag: 7rn= <br /> D. Results of Testing/Servicing <br /> Software Version Installed 327.4 <br /> Complete the followine checklist: <br /> m Yes D NO I Is the audible alarm operational? <br /> CE Yes D No' I Is the visual alarm operational? <br /> M Yes O No* Were all sensors vis;tmlly inspected,functionall tested and confirmed operational? <br /> M Yes D No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> 13 Yes D No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g. modem) <br /> M N/Aoperational? <br /> M Yes D No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> D N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? if yes:which sensors initiate <br /> positive shut-down? (Check all that apply) m Sump/Trench Sensors; m Disperser Containment Sensors• <br /> Did you conf rmositive shut-down due to leaks and sensor failurdilisconnection? m Yes 13 No <br /> M Yes a No' For tank tem <br /> syss that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> D NIA mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger'? 90 <br /> 0 Yes' m No Was any monitoring equipment replaced?If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> m Yes' o No Was liquid found inside any secondary containment system designed as dry systems? (Check all that apply) <br /> M Product;m Water. if yes,describe causes in Section E,below. <br /> Ea No' Was monitoringsystem set-upensue proper to ens7 Attach set- n /icable <br /> D No' Is all monitoring equipment operational per manufacture'sspecifications? <br /> •In SseUoa E below,describe how and when these deficieucks were or will be corrected. <br /> E. Comments: Prem and Diesel share the same annular sensor.All UDC's,STP, Fill and Vent sumps have <br /> Brine sensors. <br /> Vent sump sensor tested/passed <br /> 1 <br />