Laserfiche WebLink
• OPTION 2A I )tlf65 <br /> ARTICLE 3, SECTION 2633/2634 r r <br /> MOTOR VEHICLE FUELS ONLY p <br /> CONSTRUC N <br /> 1. Req irements: <br /> A. A roved tank construction material <br /> B. Lea interception and detection system which complies with Article 3, <br /> Secti 2631(c). <br /> C. Membran liners must comply with Article 3, Section 2633(e) , (1 ) , (2) , <br /> (3) , (4) , _ 5) and are only allowed for piping systems (Department Policy) <br /> D. Demonstrate at the leak interception and detection systems protects <br /> round water m contamination (Article 3, Section 2633(f) , (1 ) , (2) , (3) , <br /> (5) , (6) , <br /> E. Pressurized piping stems must be installed with a leak detector that is <br /> capable of automatica ly shutting off the product pumps. <br /> 1 . Any single wall com nent "tank or piping" requires daily inventory <br /> reconciliation and a u,3l precision tests as part of the monitoring <br /> program. <br /> F. Before covering, the tank(s) a system(s) must be tested to NFPA 30, <br /> Standards. <br /> G. Before use - the tank(s) and syste s) must be tested in accordance to <br /> NFPA 329. <br /> H. Provide soil profile of vadose zone if mbrane liners are used. <br /> OPTION 2B <br /> ARTICLE 3, SECTION 2634 <br /> MOTOR VEHICLE FUELS ONLY <br /> MONITORING <br /> 1 . Requirements (leak interception and detection system(s) ). <br /> A. Floor must be constructed on a firm base and sloped to a collects n sump. <br /> B. Access casings must be installed in accordance to Article 3, Secti <br /> 2634 (c) (1 thru 6) , (d) (1 ). <br /> ,—C. Submit written monitoring and response plan as stated in Article 3, <br /> Section 2634 (d) (1 -3) , 2634(e) (1-5) . <br /> D. Hard wiring of electronic monitoring systems is required. <br /> E. Provide manufacturer's written installation instructions. <br />