Laserfiche WebLink
04/09/2003 116:02 209-83018 CAL AM PERIPHERI" PAGE 02 <br /> Detailed Cost Breakdown - Proposal No. 03-2467 <br /> BENJAMIN PROPERTY <br /> 90 Mt. Oso Street, Tracy, California <br /> Sco a Work: Preparation of UST Removal Permit Application,Collection and Analysis of Soil Samples;, <br /> Report Preparation. <br /> 1 SCIIEDULING/PLANNING <br /> Scheduling/Coordination-.Nmt Manager hrs 2.0 $105.00 $210.00 <br /> Permit Application-Staff Geologist his . 2.0 $90.00 $180.00 <br /> UST Removal Permit Fees-SJCEHD unit 1.0 $308.00 $308.00 <br /> Utility Clearance ea 2.0 $75.00 $150.00 <br /> 2 SOIL SAMPLE COLLECTIONIL.ABORATORY ANALYSIS <br /> staff Geologist lits 4.0 $75.00 $300.00 <br /> Field Vehicle days 1.0 560.00 $60.00 <br /> i'Hand Auger/Soil Sampler days 1.0 $50.00 $50.00 <br /> Misc.Equipmem/Supplies unit 1.0 $100.00 '$10000 <br /> TRH-OTFX ea 2.0 $55.00 $110.00 <br /> Fuel Oxygenating Compounds ea 2.0 $110.00 $220,00 <br /> 3 REPORT PREPARATION <br /> Project Geologist hrs 3.0 $90.00 $270.00 <br /> hrs 3.0 $75.00 $225.00 <br /> SeniorGtaff lologi hrs . Lo $105.00 $105.00 <br /> Senior Geologist <br /> Draftsman hrs 2.0 $55.00 $110.00 <br /> Clerical hrs 1.0 $45.00 545.00 <br /> Total Estimated Cost: $2,443.00 <br /> Note: If additional rime/materialsImbconrract services are required to complete the scope of work,rhe final imoim will be 4wied <br /> I accordingly. <br /> i <br /> I <br /> I <br /> I <br /> Advanced GeoEnviroomental,Inc. <br /> i <br /> I <br />