Laserfiche WebLink
04/09/2003 16:02 209-830-' 18 CAL AM PERIPHERP S PAGEe4 <br /> 04/93/2093 13:28 20946711 ACE 5TOCKTON , 02 <br /> 02 April 2003 <br /> AGE-N proposal No, 03 2467 <br /> page 2 f3 <br /> ydrocarbons quantified as gasoline (TPH-g), volatile aromatics (benzene, toluen-, ell 11 <br /> enzene and xylenes; 13TEX) and total lekd. <br /> reparation of a UST removal report The report will include,all necessary docurra,:stat: t <br /> or Temoval, sampling and disposal of tho UST. <br /> :2.0. OS X <br /> The co s for the above services will bei$2,443.90- .All costs are in accordance with bur El :1 ri <br /> Soloed a of Charges;all costs will be billed to the Client on a time and materials basis-1.1.& r u <br /> circum tanceswilladditionalworkbeper£ormedwithoutpriorauthorizationtoproceedfirotti he [i <br /> Danny enjamin. <br /> 3.0- XCLUSIONS <br /> the.fo owing items are not included in this proposal: 1) Delinquent or past UST permit 'ee:; 2 <br /> Collec ori or analysis of additional soil samplcb; 3)Further excavation or removal of au lit: 16 <br /> USTs; )Equipment for excavation or backfilling; 5) Disposal of excavated soil; 6)Repla:;e-r :r <br /> of any ubsur£aee piping removed during excavation activities; 7) Regulatory,oversight ar re% n <br /> fees /or back-£ees and penalties, if required;;S)Removal and/or disposal of any aspha P <br /> eonere a materials; 9). Backfilling and/or conxpaction testing; if required; 10) Other cc st', u <br /> specifi ally stated in this proposal <br /> 4.0, ASSUIN'TZONS <br /> This p oposal assumes the following: 1) Access to the site will be secured by the Client 2) <br /> activiti s at the size can be performed during normal working hours; 3) All.costs incum( d.r t <br /> regula ry directives,.after this proposal, shall be as <br /> by the Client 4) Expense itc. e <br /> becaus of unusual or unanticipated ground condxt7iorls(such as fill,,hard soil,rock,etc.)sha.l be l li <br /> for by e Client as extra work;5)Regulatory approval of UST removal permit applicatio:i 6 t 7 <br /> area i . and around the UST(s)is unobstructed(i.e.,no structures,vehicles,etc,are locat e I a N <br /> the are to be excavated). <br /> 5.0. SCHEDULE <br /> Work 4 in the project will begin within 5 days of authorization.One day of field.work is ar,t i:il <br /> AdvaxceQGetlEnvin„nen i, 1 <br />