My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MT OSO
>
90
>
2300 - Underground Storage Tank Program
>
PR0521742
>
COMPLIANCE INFO 1994-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:57 PM
Creation date
11/7/2018 8:09:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2004
RECORD_ID
PR0521742
PE
2361
FACILITY_ID
FA0014766
FACILITY_NAME
BENJAMIN, DANNY
STREET_NUMBER
90
Direction
W
STREET_NAME
MT OSO
STREET_TYPE
AVE
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
90 W MT OSO AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MT OSO\90\PR0521742\COMPLIANCE INFO 1994-2004.PDF
QuestysFileName
COMPLIANCE INFO 1994-2004
QuestysRecordDate
10/16/2017 9:08:25 PM
QuestysRecordID
3682912
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/09/2003 16:02 209-830-' 18 CAL AM PERIPHERP S PAGEe4 <br /> 04/93/2093 13:28 20946711 ACE 5TOCKTON , 02 <br /> 02 April 2003 <br /> AGE-N proposal No, 03 2467 <br /> page 2 f3 <br /> ydrocarbons quantified as gasoline (TPH-g), volatile aromatics (benzene, toluen-, ell 11 <br /> enzene and xylenes; 13TEX) and total lekd. <br /> reparation of a UST removal report The report will include,all necessary docurra,:stat: t <br /> or Temoval, sampling and disposal of tho UST. <br /> :2.0. OS X <br /> The co s for the above services will bei$2,443.90- .All costs are in accordance with bur El :1 ri <br /> Soloed a of Charges;all costs will be billed to the Client on a time and materials basis-1.1.& r u <br /> circum tanceswilladditionalworkbeper£ormedwithoutpriorauthorizationtoproceedfirotti he [i <br /> Danny enjamin. <br /> 3.0- XCLUSIONS <br /> the.fo owing items are not included in this proposal: 1) Delinquent or past UST permit 'ee:; 2 <br /> Collec ori or analysis of additional soil samplcb; 3)Further excavation or removal of au lit: 16 <br /> USTs; )Equipment for excavation or backfilling; 5) Disposal of excavated soil; 6)Repla:;e-r :r <br /> of any ubsur£aee piping removed during excavation activities; 7) Regulatory,oversight ar re% n <br /> fees /or back-£ees and penalties, if required;;S)Removal and/or disposal of any aspha P <br /> eonere a materials; 9). Backfilling and/or conxpaction testing; if required; 10) Other cc st', u <br /> specifi ally stated in this proposal <br /> 4.0, ASSUIN'TZONS <br /> This p oposal assumes the following: 1) Access to the site will be secured by the Client 2) <br /> activiti s at the size can be performed during normal working hours; 3) All.costs incum( d.r t <br /> regula ry directives,.after this proposal, shall be as <br /> by the Client 4) Expense itc. e <br /> becaus of unusual or unanticipated ground condxt7iorls(such as fill,,hard soil,rock,etc.)sha.l be l li <br /> for by e Client as extra work;5)Regulatory approval of UST removal permit applicatio:i 6 t 7 <br /> area i . and around the UST(s)is unobstructed(i.e.,no structures,vehicles,etc,are locat e I a N <br /> the are to be excavated). <br /> 5.0. SCHEDULE <br /> Work 4 in the project will begin within 5 days of authorization.One day of field.work is ar,t i:il <br /> AdvaxceQGetlEnvin„nen i, 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.