My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
INSTALL_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 1:12:59 PM
Creation date
11/7/2018 8:18:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2015
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MYRTLE\2849\PR0538822\INSTALL\2015 INSTALL SR0069410\GENERAL INSTALL PAPERWORK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' W, WWMWj • Anchor points must be aligned with designated anchor <br /> " ribs D C (t1"). Do not use straps between ribs except <br /> on 4'tanks. <br /> • Maintain proper distance between anchor points <br /> Every site should be evaluated for buoyant conditions across the diameter of the tank: <br /> including but not limited to local water tables,flooding <br /> and trapped water.Failure to provide sufficient - For deadmen, place inside edge of deadman <br /> at the tank shadow. <br /> overburden and/or appropriate anchoring may result <br /> in tank failure and property damage may occur. - For bottom anchor pad, position anchor points <br /> 6"for 4', 6', 8'tanks and 9"for 10'and 12'tanks <br /> It is the responsibility of the tank owner or tank owner's from tank shadow. <br /> representative to determine the appropriate anchoring • All anchor straps must be uniformly tightened with <br /> method and to design the anchoring system. turnbuckles or come-a-longs. Straps should be snug, <br /> CSI has provided an"Anchor Chart"at the end of but not cause tank deflection. <br /> this instruction booklet(Appendix A)that covers the ANCHOR POINT LOADS <br /> minimum burial depths for the three common methods of <br /> anchoring tanks. • For any anchoring system,the tank strap and all <br /> The three common methods are: hardware should be designed for the following <br /> 1. Deadmen Anchors maximum working loads(see Table H-2). <br /> TABLE H-2 <br /> 2. Concrete Anchor Pad Anchor Point Load Allowed <br /> 3. Overburden (no mechanical anchoring) Tank Diameter Maximum Load <br /> CSI offers an engineered mechanical anchoring system 4' 1,261 lbs(572 kg) <br /> designed for each size tank consisting of deadman <br /> anchors, straps,and hardware. 6' 5,405 lbs(2,452 kg) <br /> Burial depth, straps,tumbuckles, shackles,wire rope, 8' 7,508 lbs(3,406 kg) <br /> deadmen and anchor pads can be combined to provide 10' 7,508 lbs(3,406 kg) <br /> anchoring using the information provided in this section. <br /> 12' 7,508 lbs(3,406 kg) <br /> �..i The mechanical anchoring methods are shown <br /> in Figure H-1. • The installing contractor is responsible for providing <br /> Figure H-1 hardware and anchor points of sufficient size and <br /> Mechanical Anchoring Methods strength. <br /> • For specific information on hardware and usage, <br /> consult the hardware manufacturer or supplier. <br /> csi <br /> Anchors n FIBERGLASS ANCHOR STRAP <br /> Tank Concrete Figure H-3 <br /> Shadow Anchor Pad g <br /> Strap Length <br /> 1_ <br /> 7l8' <br /> , <br /> (48m no <br /> -Fiberglass <br /> Galvanized <br /> 2-78" Strap Eyelet <br /> (73mm) <br /> 6"-s- Tank Diameter Strap Length <br /> GENERAL ANCHORING REQUIREMENTS 4' 100"(2,646mm) <br /> • Prior to anchoring,take the first deflection 6' 141"(3,185mm) <br /> measurement after the tank is lowered into the 8- 176"(4,464mm) <br /> excavation. If mechanical anchoring is used,take the <br /> second deflection measurement of the tank after the 10' 238"(6,045mm) <br /> anchoring is complete and record the results on the 12' 271"(6,877mm) <br /> Tank Installation Checklist(Additional information on <br /> deflection measurements can be found in Section 1). <br /> • Use only CSI anchor straps <br /> • Use correct length anchor straps for each diameter <br /> tank. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.