My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
INSTALL_2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 1:12:59 PM
Creation date
11/7/2018 8:18:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2015
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MYRTLE\2849\PR0538822\INSTALL\2015 INSTALL SR0069410\GENERAL INSTALL PAPERWORK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NAMEImp — e �.; ;,,�_ z INSTALLATION PROCEDURE <br /> • Determine if geotextile fabric is required for your <br /> installation(see Section F for details). <br /> Do not enter the tank excavation unless all OSHA • All tank holes must have a minimum of 12"(18"for <br /> requirements are followed. wet holes)and a maximum of 24"of approved backfill <br /> Collapsing excavation walls may cause death between the bottom of the tank and the bottom of the <br /> or serious injury. excavation or concrete anchor pad. <br /> • Place tank in excavation with lifting cables attached to <br /> BEFORE YOU BEGIN lift lugs provided on tank,while maintaining control of <br /> It is important to review all instructions to make sure you tank with guide ropes(see Figure A-2 or A-3). <br /> are compliant with the proper procedures.This includes: • Set tanks directly on backfill bed. <br /> • Bed and Backfill • Take the"First Vertical Diameter Measurement"and <br /> • Pre-Installation Testing record the value on the Tank Installation Checklist <br /> • Hole Size/Burial Depth (see Figure I-2). <br /> • Anchoring Figure 1-2 <br /> First Vertical Diamstor Measuremont <br /> TANK VERTICAL DIAMETER MEASUREMENTS <br /> Each vertical diameter measurement is used to <br /> determine the tank's deflection. If at any point the <br /> deflection measurements exceed the values in Table 1-1, <br /> stop the installation and contact Tank Technical Support. <br /> During installation, vertical diameter measurements must <br /> be taken and recorded on the Tank Installation Checklist <br /> after each of the following steps: <br /> • "First Vertical Diameter Measurement" Backfill Bed <br /> / <br /> - Placement of tank on backfill bed <br /> / <br /> • "Second Vertical Diameter Measurement" � \ � ��� � <br /> - Anchoring completed <br /> (only applicable if mechanical anchoring is used.) Measure from the bottom of the tank <br /> • "Third Vertical Diameter Measurement" to the bottom of the fitting <br /> - Backfill to tank top. If mechanical anchoring is used,after anchoring <br /> • "Fourth and Fifth Vertical Diameter Measurements" is completed,take the"Second Vertical Diameter <br /> - Backfill to subgrade,before the concrete pad. Measurement"and record the value on the Tank <br /> Installation Checklist. If this value does not equal the <br /> Separate vertical diameter measurements must be "First Vertical Diameter Measurement',loosen the <br /> recorded for each tank compartment. anchor straps(see Figure 1-3). <br /> • All measurements for vertical deflection are made Figure 1-3 <br /> from the bottom of the tank to the bottom of the fitting. <br /> • All measurements should be made in inches or Second Vertical Diameter Messuroment <br /> millimeters using a standard nonmetallic gauge stick. <br /> • All measurements should be made through the fitting <br /> closest to center of tank or each compartment. / <br /> or <br /> Refer to Table 1-1 for maximum deflection values. Straps / <br /> TABLE 1-1 <br /> Tank Diameter Maximum Deflection <br /> 4' 1/Z' (12mm) <br /> 6' W. (19mm) / <br /> 8' 11/;' (31 mm) <br /> 10' 1 11/2" (38mm) <br /> 12' 11/z' (38mm) V \ <br /> Measure from the bottom of the tank <br /> to the bottom of the fitting <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.