Laserfiche WebLink
S WRCB January,2002 0 Page_of_ <br /> 9. SPI LL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With SpUl/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but Were Not Tested❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum []Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> rt <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> 7BucketDepth: <br /> n applying <br /> water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RO: <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF Rj): <br /> FaslFail Threshold or <br /> teria:st Result: Q PASS ❑Fail ❑ ❑Pass ❑Fait ❑ ❑Pass ❑Fail ❑ ❑Pass Fail Q <br /> Comments—(include information on repairs made prior to testing,and recommendedfollow-up for failed tests) <br />