Laserfiche WebLink
Veeder--Root Line Leak Appiicon Guide • <br /> 4. Locate red switch bank labeled S1 on the CPT's Controller CPU board,and verify that dip switch 2 is set to the Closed <br /> position (to enable the PLLD precision line leak function),and dip switch 8 is set to the Open position(to disable the CPT's <br /> line leak function). <br /> 5. Verify that the Rotary Pressure Dial,also on the CPT's Controller CPU board,is set to either the 2(24 psi),3(27 psi),4(30 <br /> psi),5(33 psi),or 6(36 psi)position. <br /> i= . �O nnm ptplld as <br /> t <br /> ii <br /> t 1 n <br /> `� _ <br /> Qo _ n ` -�— a___,______ <br /> Tom+ �.. FLH'!!►"" .q�_______________-;; <br /> Q <br /> " DPLLD or PLLD i1 <br /> transducer <br /> DPLLD or PLLD ® Only <br /> transducer O <br /> O in SwiftCheck <br /> l0 O Valve O <br /> - � SpikeCheck <br /> O Valve Assy. <br /> Functional � <br /> Element <br /> Red Jacket Standard CPT Red Jacket Quantum CPT <br /> Transducer Installation - Red Jacket Big-Flo Pumps, Red Jacket Maxxum Pumps and FE Petro <br /> High Capacity Pumps <br /> BIG-FLO PUMPS <br /> 1. You will need to install a reducing tee(customer supplied)in either of the 3-inch discharge ports of the pump with the 2- - <br /> inch opening facing up. If you have the room,it may be easier to install this tee between the Pressurstat kit and the unused <br /> port instead of in the discharge line(as shown in the figure below).Alternatively,the DPLLD or PLLD transducer can be <br /> installed in the leak detector port of a Big-Flo leak detector if it is already present in the line(as shown in the figure below). <br /> 2. Install the Red Jacket Big-Flo Pressurstat Kit(Red Jacket part number 144-314-5)following the instructions with the kit. <br /> 3. Thread the DPLLD or PLLD transducer into the 2-inch opening of the tee. <br /> IMPORTANT!Seal any pipe threads using a UL-classified,nontoxic pipe sealant suitable for the fuel involved. <br /> 4. Verify that the TLS-350 Series Console has Version x19 or later(TLS-450 Series Console has Version 1 or later)software. <br /> Junction box <br /> OPTIONAL INSTALLATION EXAMPLE (customer supplied) <br /> 3/4"NPT Union, <br /> 3/4'NPT nipples, DPLLD or PLLD transducer <br /> reducing nipple Seal-off,epoxy seal <br /> customer nipple <br /> lied / 3"discharge line p xy per NFPA <br /> ( PP ) '( spec(customer supplied) <br /> (to dispensers) <br /> � conduit to console <br /> (customer supplied) <br /> OF <br /> or PLLD transducer in 2'port <br /> J' A of Big-Flo Leak Detector(customer <br /> / Red Jacket Big �upplied) <br /> Red Jacket Big-Flo Pressurstat kit- 3"x 3'90 degree elbow <br /> Pressurstat -5 PIN2'x2"x3"reducing tea P/N 144314-5 (customer supplied) <br /> (cu 144er sup and 3'NPT nipple (customer supplied) <br /> customersu lied 3'discharge line(to dispensers) <br /> ( supplied) (customer j i <br /> l4 <br /> 12 <br />