Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps <br /> Fill Riser Containment Sumps are Present,but were Not Tested X <br /> Test Method Developed By: a Sump Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: I Pressure Vacuum h Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Fill Sump# Fill Sump# Fill Sump# Fill Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying J u l <br /> water and starting test: <br /> Test Start Time: <br /> Initial Reading R,): ENVIHUlq_ - <br /> Test End Time: ` - IT <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: <br /> Is there a sensor in the sump? <br /> Does the sensor alarm when <br /> either product or water is <br /> detected? <br /> Was sensor removed for testi n ? <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br /> Fill Riser Containment Sumps not tested with this testing event. <br />