My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWELL
>
1975
>
2300 - Underground Storage Tank Program
>
PR0232521
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 2:26:36 PM
Creation date
11/8/2018 9:38:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0232521
PE
2361
FACILITY_ID
FA0004044
FACILITY_NAME
TRACY USD - SERVICE CENTER
STREET_NUMBER
1975
Direction
W
STREET_NAME
LOWELL
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23213008
CURRENT_STATUS
01
SITE_LOCATION
1975 W LOWELL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\L\LOWELL\1975\PR0232521\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
11/29/2017 7:25:21 PM
QuestysRecordID
3737183
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: Date of Testing(Seruicing: <br /> F. Ira-Tank Gangiag/SIR Equipment: Check this bort if tank gauging is used only for inventory canrol. <br /> ❑ Ch=k this box if no tank ganging or SIR equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Cole tete the following checklist: <br /> ❑ Yes ❑ No' 1 Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No' I Were all tank gauging probes vrsmatly inspected for damage and residue buildup? <br /> ❑ Yes ❑ Noy Was accuracy of system product level readings rested? <br /> ❑ Yes 10 No* 1 Was accuracy of system water level readings tested? <br /> ❑ Yes 1 ❑ No' Were all probes reinstalled properly' <br /> Yes I ❑ No' Were all items on the equmment mamdacirner's maintenance checkfist completed? <br /> In the Section H. below.describe hum and when these deficiencies were or will he zorrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box,f LL—s are not oasratlea. <br /> CoamAete the following checklist: <br /> Yes ❑ No" : For equipment .=a-"ip or annual Ampmem tion, was a leak simulated to verify LLD performance' <br /> ❑ N/A (Check all that apply) Simulated leak rate: (I g.p.h.', ❑0.1 g.p.h."; ❑0.2 g p.h. <br /> Notes: 1. Required for equipment start-up certification aid annual certific adon. <br /> 2. Umiess mandated by local agency,xrification required only for electronic LLD start-sup. <br /> ❑ No' Were all LLDs confirmed operational amt accurate within motlatory requirements? <br /> ❑ No* Was the testing apparmus property calibrated? <br /> Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ )W For dectrom LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> A <br /> ❑ Yes ❑ �(o" For esectromc LLDs. does the nrbirre automatically stint if any portion the monitoring syen is disabled <br /> N/A or disconnected? <br /> ❑ Yes ❑ thO For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> Cr�NIA malfhuctions or fails a tet? <br /> ❑ Y ❑ For c lectrondc LLDs, have all accessible wiring connecum as been visually inspected? <br /> Gd'N/A <br /> Yes ❑ Not Were all stems on the Nutriment marruGa:mrer*e waimenance cbA zcklist,:empteted? <br /> In the Section H,below.describe how and when these deficiencies were or will he corrected. <br /> H. Comments. <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.