Laserfiche WebLink
SAN JOAQUIN COUNTY DATE —Z <br /> �JVIRONMENTAL HEALTH DEPART�T PAGE <br /> 304 E. Weber Ave., Third Floor,Stockton, CA 5202 <br /> (209)468-3420 <br /> UNDERGROUND STORAGE TANK(UST) PROGRAM INSPECTION REPORT <br /> Facility Nam 1 i 7�dFacility AddressA%ls rJ LsxJeA1 Pcve_, "Ttztc G4 <br /> Facilty Contact h J,yv Title VeC:tDr Phone #_,2j%K5 1 . 0D 1 <br /> UST# I Product UST#2ProductQ�.�Q UST#_Product UST#_Product <br /> Overfill Prevention: D Audible/Visual &Wechanical Monitoring Panel:�Qy yr <br /> Piping System: 11 Gravity G7�ressure ❑Suction Violations:D M1-RDet D M2-Rprev D M3-Both <br /> Automatic Pump Shut Down Satisfies CCR 2636 (f)(5): ❑Yes P110 Designated Operator: <br /> INSPECTION TYPE: , outine Wonitoring Certification ❑Complaint Dinstall ❑Removal ❑Repair/Upgrade <br /> COMPANY NAME: C TECHNICIAN NAME: y PHONE: gpo.( UD•1y <br /> VIOLATION(S) <br /> The above facility is not in compliance with the following section(s) of Health & Safety Code (HSC)and/or <br /> California Code of Regulations (CCR): <br /> 1 HSC 25284 Permit to operate 23 CCR 2643 (d) Daily monitoring of suction <br /> 2_CCR 2637 Secondary cont. testing piping (pre-1/1/84) <br /> 3 CCR 2711(b) & (c) Current State Forms A& B 24 CCR 2636 (a) Conventional suction piping <br /> 4=HSC 25292.2 Certification of financial shall have continuous <br /> responsibility& CFO letter monitoring & 20 containment <br /> 5_CCR 2632 (c)(2) UST monitoring is present (M1) 25 CCR 2643 (e) Biennial tightness test of gravit, <br /> 6_CCR 2630 (d) UST system monitoring piping (pre-1/1/84) <br /> equipment is properly located.to _ 26 CCR 2643.(d) Triennial line test for <br /> detect a leak(M1) conventional suction (pre- <br /> 7 CCR 2637(b) UST system monitoring 1/1/84) (M1) <br /> equipment is operational (M1) 27 CCR 2661 Permit to repair UST system <br /> 8CCR 2636 (f)(1) Continuous monitoring system 28_HSC 25286 (a) Permit to alter monitoring <br /> for underground piping & UDC system <br /> is present(M1) 29 HSC 25298 (a) Illegal abandonment of UST <br /> 9CCR 2636 (c)(1) All releases in secondary piping system <br /> flow to a collection sump 30HSC 25298 (b) Permit to temporarily close US- <br /> 10 HSC 25291 (f) Line leak detector(s) (M1) system <br /> 11_HSC 25291(a)(2) Secondary containment for 31 HSC 25298 (c) Permit to close UST system <br /> UST is tight 32 HSC 25292.1 UST system is operated to <br /> 12 CCR 2635 (b)(1) Spill container(M2) prevent unauthorized release <br /> 13 HSC 25284.2 Annual spill container testing z 33 CCR 2650 Recording/reporting <br /> 14 CCR 2635 (b)(2) Overfill prevention system (M2) unauthorized release(M1) <br /> 15 CCR 2631 (a) Primary containment is product--_ 34 HSC 25291 (e) Water in 20 cont analyzed and <br /> tight properly disposed of <br /> 16 CCR 2632 (d) Monitoring &response plan 35 CCR 2640 (e) Single wall component within <br /> 17 ✓CCR 2712 (i) Monitoring & response plan is 1 000' of Public Well, no ELD <br /> on site 36 CCR 2635(a)(2)(A)Cathodic protection testing & <br /> 18 ✓ CCR 2712 (b) Maintenance& monitoring 60 day inspection log (M2) <br /> records(M1) 37 H&SC 25299(a)(9)Disabling leak detect. Devices <br /> 19 ✓CCR 2636(f)(4) Annual line tightness test 38 CCR 2715(a) Statement from UST owner <br /> 20—CCR 2630 (d) Annual line leak detector test 39 CCR 2715(c) Monthly inspection by D.O, <br /> (M1) 40 CCR 2715 (f) D.O. trained employees <br /> 21 CCR 2630 (d) Annual monitoring certification 41 Violation(s) not listed above <br /> 22_CCR 2661 (f) Repair for tank/piping has had <br /> tightness test M2 <br /> EHD INSPECTOR: PHONE: <br /> RECEIVED BY: TITLE: YV <br /> Septic Syst D Serves 2 20 persons/day D Receives other than sanitary waste <br /> Other Disposal Units Identified: D Dry wells/French Drains <br /> ewm kUMt-nnusnusr in we bcna.+9.o .DOC <br /> -N5 (act'Cr Fj rs subill f -to, r6f'n-spee,17f7naf angfilvit a+ tftps houeIg safe . <br />