Laserfiche WebLink
Comments: <br /> THIS IS THE INITIAL MONTHLY INSPECTION. OVER THE COURSE OF THE NEXT FEW MONTHS THE <br /> PROBLEMS NOTED HEREIN SHOULD BECOME NON-EXISTENT. THE TRAINING OF PERSONNEL TO <br /> KNOW AND UNDERSTAND BEST MANAGEMENT PRACTICES FOR THE OPERATION OF THE UST AND <br /> MONITORING SYSTEMS WILL BE GIVEN DUE CONSIDERATION. NOTE: THE GASOLINE DISPENSING <br /> SYSTEM IS CURRENTLY OUT OF SERVICE DUE TO THE FAILURE OF TP201.3 ON IL24104. IT IS MY <br /> UNDERSTANDING THAT THIS SYSTEM WILL REMAIN OUT OF SERVICE UNTIL THE EVR'UPGRADE HAS <br /> BEEN COMPLETED,WHICH SHOULD FIX THE PROBLEM NOTED BY THE TESTING AGENCY_ IT IS MY <br /> OPINION THAT THE SYSTEM COULD BE PLACED INTO SERVICE BY INSTALLING AN UPGRADED DROP <br /> TUBE TO MEETTHE NEW TESTING REQUIREMENTS. FOLLOW-UP REQUIRED. <br /> ITEMS#3,4,5 &SA: <br /> AS NOTED BY THE EHD INSPECTOR ON 11/24/04: PREVIOUS MAINTENANCE AND MONITORING <br /> RECORDS COULD NOT BE PROVIDED DURING THE INSPECTION. HOWEVER.ALTHOUGH RECORDS <br /> WERE INCOMPLETE THERE HAS BEEN SOME EFFORT TO COLLECT AND RETAIN RECORDS. THE SITE <br /> MANAGER HAS BEEN INSTRUCTED ON THE PROPER PROCEDURES CONCERNING THE MONITORING <br /> SYSTEM AND TRE HANDLING AND DISPOSITION OF ALARM REPORTS AND MAINTENANCE RECORDS. <br /> A MONITORING SYSTEM LOG HAS BEEN MADE A PART OF THE DESIGNATED OPERATORS NOTEBOOK <br /> AND WILL BE KEPT CURRENT AT ALL TIMES. FURTHER,A COPY OF AN ALARM NOTICE AND ALL <br /> FOLLOW-UP ACTION PAPERWORK WILL ALSO BE ATTACHED TO AND MADE A PART OF THE LOG. <br /> ITEMS#7&8: <br /> BOTH SPILL BUCKETS AND DISPENSERS HAD RAINWATER RESIDUE AND THE DIESEL DISPENSER <br /> APPEARED TO HAVE A VERY SLIGHT SEEPAGE OF DIESEL COMING FROM A SOLENOID CONTROL <br /> VALVE. THE VALVE WAS WIPED CLEAN AND WELL BE REINSPECTED FOR SEEPAGE. SITE MANAGER <br /> MADE AWARE OF PROBLEMS AND ASSIGNED MAWTENACE PERSONNEL TO CORRECT. <br /> ITEMS#9,10, 11,12,13,& 14: <br /> FURTHER RESEARCH REQUIRED TO DETERMINE CORRECT STATUS OF ALL TESTS REQUIRED- <br /> ITEMS#15&16: <br /> A COMPREHENSIVE TRAINING PROGRAM WAS INTRODUCED WITH THE ADVENT OF THIS <br /> DESIGNATED OPERATOR PROGRAM NOTE: SE TRAINING RECORD SECTION OF THIS NOTEBOOK FOR <br /> SCOFF OF TRAINING TO BE CONDUCTED. <br /> Items Requiring Follow-Up Actions: ALL ITEMS NOTED WILL,BE GIVEN FOLLOW-UP ATTENTION <br /> Instructions: <br /> Monthly visual inspection of the UST system must be conducted by a Designated UST Operator,who <br /> possesses a current "California UST System Operator" certification issued by the International Code <br /> Council. <br /> A copy of this monthly visual inspection checklist must be provided to the UST Owner or Operator, but <br /> not to the State Water Resources Control Board. <br /> The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during <br /> the monthly visual inspection that may require follow-up actions. <br /> The UST Owner or Operator must maintain a copy of this monthly visual inspection checklist and all <br /> attachments for the previous 12 months. The records must be maintained on-site or, if approved by the <br /> local agency, ofF site at a readily available location <br /> Page 2 of 2 November 2004 <br />