Laserfiche WebLink
ALITY MAME: O.S�� DL,�-s-Ib:.t ADORESS: SGS0 YV M <br /> SWEEPSS TANKC 1 ULO 3q35 TANK MODEL/NATERIAL: <br /> CAPACITY: 5 PRODUCT: waS+G O1` R.E.H.S: <br /> A I <br /> P M ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WITTEN SPECIFICATIONS <br /> R T <br /> 0 1 <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 7 UST PUNS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br /> f- 2. UST INSTALLATION PLANS APPROVED (LCR 2635 (E) (5)) <br /> 1 INITIAL INSPECTIONS <br /> OA <br /> 3. INSPECTION M TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> p <br /> b D. IVACULM:`y SOAP: PSI: HRS/MIN: BRIME(�IWID ANNULM): OTHER: <br /> 6_2 { �� 4. PRIMARY TANK TEST: 'r %./ PSI: HRS/MIN: <br /> ILI �5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL e. (Car.,•.(GOR 2.635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> -� 6. PRIMARY PIPING TEST (MINI ZGS1/30 MIM) (CCR 2635 (B) (4)) <br /> `, 'U4,• fl 7. SECONDARY PIPING CONTAINMENT TEST S PSI:ol/ HRS/MIN: OTHER: (CCR 2635 (A) (4)) <br /> q i <br /> 8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (A)) <br /> y' 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br /> 0. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (8)) <br /> 1 l FINAL INSPECTION <br /> S 13,1! 2. PERFORMANCE TEST FOR -ALL- MONITORING PROBES (LCR 2632 (C) (2)) <br /> 9 3. PERFORMANCE TEST OF CONTIMIAUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 4. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (8) (5)) <br /> Ski iWA A5. PERFORMANCE TEST OF AUTO RTIC PUQ' SYSTEM SlrUT-OFF (CCR 2635 (8) (5)) <br /> 16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br /> 17. OVERFILL PROTCTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br /> 1/. 8. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br /> PI <br /> 9. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br /> MONITORING PLAN, RESPONSE PLAN AND LOG BOCK ON SITE (CCR 2432 (E) (1) (2)) <br /> S � i •C• FORM COMPLETED AND SUBMITTED (CCT( 2635 (E)) <br /> MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br /> ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br /> �EN TS: <br /> EH23-006 302 <br />