Laserfiche WebLink
i i Page 5 <br /> ITE PREPARATION AND SYSTEM DA1T <br /> ` THREE-TANK SYSTEM 's , <br /> CUSTOMER: CCL DATE: <br /> LOCATION NO.: Z Oy y Z g d Sd 1. SYSTEM NO.: <br /> CITY/STATE: �J/4NTFG!�}' G/F' PRODUCT: c - <br /> SITE PREPARATION <br /> OTHER CONDITIONS <br /> VAPOR RECOVERY ❑ PLUGS Lzl ISER5 ��J!11 ❑ OTHER <br /> VENT <br /> ❑ NO PREPARATION M16PEN TO ATMOSPHERE ElP-V VALUE REMOVED ❑ OTHER <br /> P, REMOTE/SUBMERSIBLE (DEPTH 1 ❑ SUCTION (HEIGHT <br /> CHECK VALVE STRAINER IMPACT VALVE CHECK VALVE STRAINER SUCTION NECTION <br /> ❑REMOVED&OPEN ❑REMOVED ❑CLOSED ❑BURIED ❑REMOVED ❑UNION <br /> /_ PLUG-IN <br /> IN PLACE L�Iry ✓LACE ❑CLOSED ❑EXTRACTABLE DIN PLACE ❑COUPLING <br /> Imo/ <br /> REMOVED &COVER PEN ❑REMOVED ❑REP O CED D& COVER ❑OPEN WITH FOIL <br /> ❑CLOSED ❑REPLACED El OPEN NO FOIL <br /> REMOVED&COVER DITHER ❑IN PLACE OTHER <br /> ❑REPLACED ❑RE OVED& ❑IN PLACE <br /> REPLAC <br /> []OTHER ❑OTHE ❑OTHER <br /> TEST 1 DATA <br /> TANK 1 MTANK2 TANK 3 <br /> *FILLGauge <br /> TION DROP TUBE LLOCAT10 DROP TUBE <br /> Other ISPBQfyl IN OUT None FILL Gauqe 011ier(SPeclf yl IN OUT None <br /> T.PROBE <br /> BALANCE CALIBRATION <br /> LOCATION METHOD <br /> 'S <br /> LEVELS f/G L LSOLID ROD ❑ LIQUID <br /> 2 3 4 5 6 <br /> Tlme Tank 1 Tank 2 nk 3 AVERAGE <br /> EI <br /> 5/o f'/3 CC'S <br /> t//) r lq, s /y, s z� 9, z� iyrsr� <br /> END I/� 0 DIVISION / <br /> AVG.CC'S/DIV. <br /> ,RAT L A ULA I N <br /> LR = <br /> ±1� X CALIBRATION, <br /> DIVISIONS CC T CC IN OUT <br /> MINUTE DIVISION MINUTE (•I (—) <br /> LR= tZ,S76 <br /> TEMPERATURE COMPENSATION ITC)CALCULATION <br /> COEFFICIENT OF EXPANSION I/•F f 3785GT CE A•F CC IN OUT <br /> TC - OR <br /> GRAVITY TEMPERATURE,�F TIME MINUTE <br /> SOURCE ❑T159C <br /> ❑ A ❑ D [] CHART <br /> ❑ B ❑ E ❑ PUBLISHED DATA AT 60OF /}p <br /> ❑ C ❑ OTHER TC <br /> TANKI TANK2 <br /> SYSTEM CAPACITY,GALLONS GT TANK 1 TANK 2 TANK 3 AL <br /> SPF T�'I C>IZ L'F TC ' <br /> ±Temp. Differential <br /> T Time of Temp. / iSTime <br /> Differential, Min. f� <br /> ABSOLUTE LEAK RATE(ALR)CALCULATION <br /> ABSOLUTE LEAK RATE <br /> LEALK RATE TEMP.COMPENSATION CC/MI <br /> - /t /Z X 0.015852 • <br /> CC/MIN GAL/HOUR APR 31989 <br /> ❑ IF ALR> ± 0.05 GPH,A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS(CALCULATIONS ON CHART) <br /> ❑ A CHECK TEST WAS NOT CONDUCTED. <br /> • 60 MINUTES/HOUR T 37B5 CC/GALLON=0.015852 <br />