My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1071
>
2300 - Underground Storage Tank Program
>
PR0231431
>
COMPLIANCE INFO 1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 10:57:26 AM
Creation date
11/8/2018 9:40:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231431
PE
2361
FACILITY_ID
FA0000514
FACILITY_NAME
MAIN STREET SHELL*
STREET_NUMBER
1071
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21707011
CURRENT_STATUS
02
SITE_LOCATION
1071 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1071\PR0231431\COMPLIANCE INFO 1986-1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4, At the conclusion of the test, the person petiormin8 <br /> the test will prior the test results and rocoW d=M the Shell <br /> Electronic Monitor Sheet. <br /> S. Read the test results and perform additional steps as necessuy- <br /> Paw Record the results, and keep the Pr'nt out. <br /> Invalid Dae to Temperature: <br /> Most <br /> Lely you received a drop too close to test time, Retest your tank. <br /> Invalid Due to Theft: <br /> Most likely someone pumped during a test. Retest your teak. <br /> Fail: the induct that failed <br /> 1, phone Service Station Services at 800-887,8009. Give your name. address, P <br /> and the leak rate shown on the print-out. <br /> 2. Retest your tank the following night <br /> HOW To MCHED10LE A TFST, AS NEaSSARY <br /> 1. Put the key in the Program mode- <br /> 2. Paas the'F'Key, than 87, then push'ENT'. <br /> 3. Helot the tank to roast or change(1.2,3 or 4). Press the appropriate tank number then push EW'. <br /> 4. The system will ask how often to test. Press 3 and then'ENT' for mmthly testing. <br /> S. The system will pxcmp you for what day of the month to test Select the appropriate day (1-31)then push'ENT'. <br /> 6. The system will ask far a staxt time. posh'ENT' to keep the 12:01 A.M.start time. Push'ENT' again to keep the <br /> 5:00 A.M.stop time- <br /> 7_ Return the key to the run position. <br /> PRFVBNCAUM MAlInTVANCE <br /> The monitoring eq . ent shall he inspected and wxhfred annually. Maintenance will be performed annually or as <br /> the monitoring system will be in accordance to the manufacturers recommendahans. <br /> needed All work performed toTRA <br /> �� th the <br /> operator. am trained on the proper operathons of the monitoring 6*410ent in accordsuee wi <br /> manufacturer's instnrctioms. <br /> 3 <br /> t00 iE 1110 'I'13H5 OST95L90T5 RVA OT:OT SO/Larto <br />
The URL can be used to link to this page
Your browser does not support the video tag.