My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018 PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018 PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 4:47:15 PM
Creation date
11/8/2018 9:40:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018 PLAN
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
MANTECA CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL PLAN.PDF
QuestysFileName
2018 INSTALL PLAN
QuestysRecordDate
5/2/2018 6:46:32 PM
QuestysRecordID
3878440
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VICINITY MAP PIPING LEGEND <br /> 99 <br /> MANTECA 3"OVER 2"DOUBLE WALL FIBERGLASS PRODUCT PIPING <br /> 3"OVER 2"OR 4"OVER 3"F.G.DOUBLE WALL FIBERGLASS VAPOR RECOVERY PIPING <br /> 3"OVER 2"F.G. DOUBLE WALL FIBERGLASS VENT PIPING <br /> vv <br /> ke ' NOTES: <br /> W YOSEMITE AVE �y"y E YOSEMITE AVE 120 1. CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN INTENT AND THE CONTRACTOR .a, <br /> IS PERMITTED TO ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD CONDITIONS AND INSTALLATION TECHNIQUES. <br /> NORTH 2. PRODUCT,VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 1/8"PER FOOT MINIMUM, 1/4"PER FOOT PREFERRED.VENT STACK a r c h i t e c t u r e <br /> PIPING TO SLOPE 1/4"PER FOOT. e n g i n e e r i n g <br /> m SCALE: N.T.S. <br /> z a 3. SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY ALL PRODUCT PIPING TO BE DOUBLE CONTAINMENT L,�IB �55oGiaieSr Ltd. <br /> N PIPE ROUTED IN CONTAINMENT DUCT.ALL PRODUCT,VENT,AND VAPOR PIPING TO BE DOUBLE WALL FRP PIPING. <br /> 4. IT IS THE INTENT OF THIS DESIGN TO PROVIDE A TANK&PIPING SYSTEM COMPLIANT WITH AB-2481 REQUIREMENTS FOR CONTINUOUS 867 Pacific Street,Suite 120 <br /> MONITORING OF ALL TANK&PIPING SYSTEMS.THE PIPING ANNULAR SPACES WILL BE MONITORED VIA CONTINUOUS VACUUM SENSORS. San Luis Obispo,CA 93401 <br /> 120 ALL TANK ANNULAR SPACES AND TANK SUMPS, DISPENSER SUMPS,AND VENT SUMPS SHALL BE MONITORED HYDROSTATICALLY.ALL ph 805.540.5240 <br /> aUIN7A MONITORING DEVICES AND SYSTEMS SHALL BE 3RD PARTY CERTIFIED FOR USE IN CA AND APPROVED UNDER LG-113 AND NWGLDE. fax 805.540.5241 <br /> E ATHERTON DR " <br /> "« 5. TO CALCULATE TOP OF TANK ELEVATION.START WITH 18"MINIMUM DEPTH OF VAPOR RECOVERY LINE AT THE FARTHEST DISPENSER www.LHBaesa.wm <br /> W ATHERTON DR x"s. AND SLOPE 1/4"PER FOOT MAXIMUM TO 1/8"PER FOOT MINIMUM ADD 12"AT THE TANK ADD 13"(FOR 3"PIPE)OR 8"(FOR 2")FOR A <br /> CHANGE IN PIPING DIRECTION OTHER THAN 90 OR 45.SET TANKS 6"DEEPER THAN CALCULATED AS PRECAUTION IN NO EVENT HAL <br /> CTURERS <br /> E w000wARD AVE c Ite ." INSTTHE ALLATION ON RE OMME DATIONS.ANY VNK BE BURIED LESS THAN 4'-0" OW FINISHEC ARIATIONS N SLOPE ADE PROMS 5FpCn{f.Id1L`� Y�IDTED TO THEEOWNER'SA ENGINEER. <br /> site Y" 0 1111.....���V le YY LLL....V QQpFESS/Q,� <br /> • Pfi3�`� 2 2 2018 � <br /> SHEET INDEX REFERENCE NOTES ��o " SBIgl0 <br /> 1�i No.78916 An <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> _ ;J ;r. 81 1 16. TANK CONSTRUCTION AND TESTING SHALL BE IN ACCORDANCE WITH NATIONALLY RECOGNIZED CODES. m <br /> AT LEAST TWO DAYS 17. STATE WATER RESOURCE FORMS A,B,AND C SHALL BE COMPLETED AND SUBMITTED TO THE GOVERNING AGENCY. m <br /> BEFORE YOU DIG 18. ALL SITE INSPECTIONS SHALL BE SCHEDULED A MINIMUM OF FIVE WORKING DAYS IN ADVANCE OF REQUESTED DATE. <br /> 19, FUEL SYSTEM INSTALLATION SHALL BE IN COMPLIANCE WITH LOCAL CUPA REGULATIONS FOR UNDERGROUND STORAGE TANKS AND <br /> UNDERGROUND SERVICE ALERT OF CALIFORNIA HAZARDOUS MATERIALS. 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.