Laserfiche WebLink
MACHINED SCREW. MATCH <br /> 3–WAY BALL PRE–THREADED HOLES ON <br /> VALVE (TYP.) BALL VALVE (TYP. 2 PER <br /> VALVE) <br /> 3 <br /> 1 -1/2" x 1 -1 x 10"f <br /> z z z ANGLE IRON. MOUNT ON <br /> Lij > Li <br /> TO SENSO HOUSING. <br /> a r c h it e c t u r e <br /> �� engineering <br /> Liz <br /> VACUUM 0 J_++B & ,Associates? Ltcl. <br /> SENSOR 867 Pacific Street,Suite 120 <br /> San Luis Obis CA 93401 <br /> DOUBLE WALL ASSEMBLY P°� <br /> VENT PIPING . MACHINED ph 805.540.5240 <br /> SCREW fax 805.540.5241 <br /> www.LHBassoc.cDm <br /> VACUUM <br /> MONITORED) (TYP. 3) o <br /> LOCK WASHER <br /> — 0 0 0 (TYP. 3) FESS/ <br /> pR0 <br /> LIQUID MACHINED <br /> FILL SUMP TURBINE SUMP FLOAT NUTFILL SUMP TURBINE SUMPSENSOR (TYP 3) o: No.78916 An <br /> .03/18. P <br /> VAC SENSOR qTP IV oe <br /> ° o �_ ASSEMBLY OF CALF <br /> 2 SENSOR KIT 2 SENSOR KIT <br /> W/ TANK W/ TANK <br /> 91 PRODUCT CONSULTANTS <br /> DIESEL PRODUCT <br /> VENT VENT VAC FLOAT <br /> VAPOR <br /> 3 <br /> _ p 1/4" VACUUM TUBING <br /> FROM SECONDARY <br /> CONTAINMENT ITEM <br /> BEING MONITORED <br /> VEEDER-ROOT 3-WAY BALL VALVE MOUNTING DETAIL <br /> NOT TO SCALE <br /> REVISIONS <br /> III \ PLAN CHECK 84 <br /> 117 DECEMBER 2016 <br /> R ['/ 63 <br /> 8 684,35 29 MARCH 8 016 <br /> III ,000 GAUDNS 11GJ ,000 GA� NS #13 SJC EHD PLAN CHECK <br /> #SR0076222 8 NOVEMBER 2017 <br /> \� \/ DOUBLE WALL SUBMITTAL DATES <br /> PRODUCT PIPING <br /> (VACUUM MONITORED) OWNER: <br /> 03/29/2016 <br /> \ — <br /> REG. AGENCIES <br /> O.T.B. <br /> PROJECT NO. <br /> 15-13-001 <br /> DRAWN BY: <br /> AFS <br /> DOUBLE WALL DISPENSER CHECKED BY: <br /> CONTAINMENT SUMP (W/ JRB <br /> DOUBLE WALL VENT HYDROSTATIC MONITOR) mmmmommommmomm <br /> TRANSITION BOX (TYPICAL) <br /> TURBINE SUMP <br /> FILL SUMP <br /> DOUBLE WALL <br /> VAPOR PIPING (y) <br /> Il- <br /> (VACUUM MONITORED) W `M <br /> W 0) <br /> 3 SENSOR KIT 3 ° V) Z <br /> W/ TANK 87 PRODUCT <br /> DOUBLE WALL <br /> VENT PIPING <br /> W z <br /> Of <br /> LL <br /> MO ITORED) J <br /> VAPOR <br /> VENT <br /> Q OQ <br /> 3 rn ULl <br /> F– <br /> LLV <br /> 3 <br /> a SHEET TITLE <br /> VACUUM MONITORING NOTE: ZONE: 4 <br /> VACUUM MONITORING SHALL BE COMPLETED TO AREA BEING MONITORED: 91 PRODUCT LINE <br /> 0 <br /> SATISFACTION OF ENVIRONMENTAL HEALTH STAFF. LOCATION OF SENSOR: 91 STP SUMP N <br /> III \I I TERMINATES: AT ALL UDCs <br /> O m <br /> II 0 00 GAUD NS I ZONE: 1 CALCULATED VOLUME. 34 GAL VACUUM ZONE <br /> AREA BEING MONITORED: 87 PRODUCT LINE <br /> LOCATION OF SENSOR: 87 STP SUMP ZONE: 5 Cb <br /> W DIAGRAM <br /> � <br /> M <br /> o <br /> TERMINATES: AT ALL UDCs AREA BEING MONITORED: 91 VENT <br /> I\\ I CALCULATED VOLUME: 43 GAL, LOCATION OF SENSOR: 91 STP SUMP q <br /> TERMINATES: VENT TRANSITION SUMP <br /> ZONE: 2 CALCULATED VOLUME: 7 GAL. o <br /> AREA BEING MONITORED: 87 VENT o <br /> LOCATION OF SENSOR. 87 STP SUMP ZONE: 6 0 <br /> 9 <br /> TERMINATES: VENT TRANSITION SUMP AREA BEING MONITORED: DIESEL PRODUCT LINE o <br /> / CALCULATED VOLUME: 16 GAL. OF SENSOR: <br /> LOCATION <br /> SEL STP SUMP <br /> ES: AT ALL UDCs U <br /> ZONE: 3 CALCULATED VOLUME: 35 GAL 8 SHEET NO. <br /> AREA BEING MONITORED: 87/91 VAPOR RETURN LINE <br /> LOCATION OF SENSOR: 87 STP SUMP ZONE: 7 <br /> TERMINATES: AT ALL UDCs AND 91 PRODUCT STP SUMP AREA BEING MONITORED: DIESEL VENT 9 S- /'� <br /> CALCULATED VOLUME: 53 GAL. LOCATION OF SENSOR: DIESEL STP SUMP a J L <br /> VEEDER-ROOT VACUUM TUBING AND SENSOR LAYOUT TERMINATES: VENT TRANSITION SUMP <br /> NOT TO SCALE CALCULATED VOLUME: 9 GAL. <br />