Laserfiche WebLink
s� <br /> 1 7"CONCRETE SLAB <br /> AT 87.6 LB/CIF <br /> 2'-0" <br /> 2'-0" 3T-5 112" 2-#6 BARS <br /> EACH SIDE OF <br /> MANHOLE <br /> r�3 <br /> 1'= s <br /> o a r c h it a c u r e <br /> bti i N engineering <br /> - -- -- ---- ----- ' ` --- ` ---- --- --- -fA.4 a <br /> 3., <br /> CLEAR 867 Pacific Street, 3401ite 0 <br /> San Luis Obispo,CA <br /> {• r' MIN. ph 805.540.5240 <br /> SUBMERSIBLE ILLNENT42" T,.p <br /> PUMPNAPOR 48" DIA�v1ETER SUMP fax 805.540.5241 <br /> DIAMETER SUMP -TYPICAL _ - #4 BARS AT www•LHBassoc.com <br /> TYPICAL -;,•,_;- ;;.i --`: 16"O.C. <br /> ir;'�-r,•Ay.1 • EACH WAY <br /> I FS-4 �� • i;ij, r,-r1e'1 j I � • II _- %� I .__. FESS/ <br /> Lu <br /> q <br /> (2) h Q k <br /> 4'DIA. O. Ii 8,000 GgILLON �� 12,000G LLON u0i No.78916 A <br /> m 20,000 GALLON ;{' PREMIUM SE a .03/18 <br /> SUMPS PPP111DDD <br /> Z <br /> UREGULAR NLEADED UNLE ED `�. DIE EL N <br /> -- T �e <br /> v ---- -----1-------- -----=---- -- {.: IV1L <br /> -- {- --- ----.•---- ----•.--' -.-------------1---------------------------- <br /> --------- --- i -..---_----- .. .. i N qTF OF CAL\FO <br /> I I II I I <br /> I <br /> BRINE- <br /> CONTROL <br /> RINE CONTROL JOINT RESERVOIR <br /> I OBSERVATION WELL BRINE CONSULTANTS <br /> PER DETAIL 3/FS-5 RESERVOIR -SPACING PER <br /> SOILS REPORT <br /> -TYPICAL OF(2) <br /> -IF REQUIRED BY LOCAL <br /> JURISDICTION <br /> I I <br /> TANK <br /> 142 GRAVEL <br /> 11'0# COLUMN <br /> 6 � ; ^ UNDERGROUND TANK PLAN <br /> I I <br /> L SCALE: 1/4"=1'-0" <br /> .67'x 1.5'x 36' 5 <br /> DEADMAN <br /> I I <br /> BUOYANCY CALCULATIONS(20,000 GALLON TANK) <br /> REVISIONS <br /> CALCULATION BASED ON SUBMERGED WEIGHT OF MATERIALS: <br /> PLAN CHECK#16-3684 <br /> "CONTAINMENT SOLUTIONS"TANK WITH SPHERICAL ENDS. <br /> 1 07 DECEMBER 2016 <br /> (10'NOMINAL) <br /> TANK LENGTH:38'-2 3/4" <br /> TANK DIAMETER: 10'-0" Q ENGINEERING PLAN CHECK <br /> 84,3685 29 MARCH 2016 <br /> TRY 36'-0"DEADMAN, EACH SIDE, 18"WIDE x 8"HIGH 2 SJO EHD <br /> PLAN CHECK <br /> EMPTY TANK UPLIFT= 20.404 GAL =2,728 CU FT #SR0076 <br /> 3 #SR76222 6 NOVEMBER 2017 <br /> 7.48 GAL/CF <br /> 2,728 CU FT X 62.4 LBS/CF=170,215 LBS(DISPLACED WATER) <br /> TANK SUMP UPLIFT=(2)X 3.14 X 2'2 X 4'= 100.5 CU FT <br /> 100.5 CF X 62.4 LBS/CU FT=6,271 LBS(DISPLACED WATER) <br /> SUBMITTAL DATES <br /> TOTAL TANK UPLIFT=166,436 LBS+6,271 LBS= 172,707 LBS? <br /> OWNER: <br /> HOLD DOWN CALCULATION <br /> 03/29/2016 <br /> 1.TANK SLAB: REG.AGENCIES <br /> .58'X 14.0'X42'=341 CU FT <br /> F 1 7 1 g <br /> 2.CUBED BACKFILL ABOVE TANKS 2 1 5 1 4 <br /> 3 4'X 10.0'X 38.25'=1,530 CU FT-100.5 CU FT=1,429.5 CU FT FS-5 FS-5 FS-5 FS-5 FS-5 FS-5 - <br /> FS-5 FS-5 FS-5 O.T.B.: <br /> 1,429.5 CU FT X 57.6 LBS/CU FT=82,339 LBS j <br /> 3.CURVED BACKFILL ABOVE TANK <br /> 3.14 X 5.0'2 O. <br /> X 38.25'=3,002.6 CU FT ur - - - - - - - - - - <br /> 10.0'X 10.0'X 38.25'=3,825.0 CU FT z ¢ z 24 - - - - - - - - _ _ PROJECT N <br /> 3,825.0 0. FT-325'= CU .0 =822.4 CU FT=411.2 CU FT A.C.PAVING TANK SLAB / \ / / / 15-13-001 <br /> Z. TYP. DRAWN BY. <br /> 2 �OFESS/0 0 3 3 <br /> 411.2 CU FT X 57.6 LBS/CU FT=23 685 LBS j Q ° 3 D AFS <br /> 4.GRAVEL COLUMN ABOVE DEADMEN: k� q S BF - n - ° <br /> a a <br /> 1.5'X 14.5'X 36.0'X 2=1,566 CU FT _ - ° I - '. °a <br /> d. ° ° TT'�1T=71T CHECKED BY: <br /> 1,566 CU FT X 57.6 LBS/CU FT=90,202 LBS jIII-III-III-i JRB <br /> 5.CONCRETE DEADMEN' W No.78916 <br /> 0.67'X 1.5'X 36.0'=36.2 CU FT a .03/18 I-III-III-III ° 1"CONDUIT LOOPS TO° ° I -III-III III <br /> 36.2 CU FT X 87.6 LBS/CU FT X(2)=6,342 LBS j N9 C( )L ��P -III-III-III- <br /> I SUMPS I I ° ° o•o ° III-III-III-I <br /> 6.DRY WEIGHT OF TANK: 11,425 LBS j T III III III V CONDUIT HOMERUN <br /> TOTAL HOLD DOWN 243.865 LBS 1 TF OF CAL\�0 TO BUILDING I ° -III III-I I - <br /> 1 -I I -I I-I I PRODUCT PIPING I O °°° III-III-III-I <br /> -III-III-III 4"SCH 40 PVC OR FRP <br /> TOTAL HOLD DOWN: 243,865 LBS=1.41 SAFETY FACTOR _ RISER TO GRADE I O O 00.00 <br /> I-III-III-III <br /> TOTAL TANK UPLIFT: 172,707 LBS I -III <br /> 4"BLACK STEEL RISER I I I I °opo•a°.'0°° III-III-III- <br /> o VENT PIPING o 0 0°` >°°00 I-III-III-III M <br /> III I-III-I <br /> III-III-III <br /> SUMEMONITOR LIQUID PAL I I I ° III-II-TMCoO V- W <br /> I I II I I :° -I -III-� Q W °- <br /> - DUALFLOAT I O I 0,°,°•o f- Q <br /> _ ° HYDROSTATIC O # I I OO III-III-III- ` ` <br /> -III-III MONITORING SENSOR I I O q ° °° o •° -III-III-I v Z Q� <br /> -III-III= <br /> -I-IIII-II-_IIII-II I °•° Q° a HYDROSTATIC I \\ 00 <br /> ° ` III Iw <br /> Q 0Q RESERVOIR a0 <br /> 00.0 F <br /> eo o = Q <br /> I III-III-III Z <br /> o / I I EWTRACTOF2�\ O o I-III-III- ' O Q <br /> ' <br /> -III-III 0 �/ l I I 1 FXXXT///TTTTNGTOR \ _- - FITTING o° � V <br /> IIIIIIIIIIIII - - \ / - - - - - - - - - � - - - � - - - III-III-II W <br /> .1 GPH MAG PROBE OVERFILL VALVE SET \ I-III-III- CD ~ <br /> .1 GPH MAG PROBE OVERFILL VALVE SET TANK LEVEL GAUGE @ 95% \\ III-III-I z <br /> GE @ 95 <br /> _ TANK LEVEL GAUGE /° <br /> I 1- � I-III-III <br /> III =1111 /� 8,000 GALLON III-III-I V <br /> PREMIUM \ I-III-iI <br /> 12,000 GALLON _ <br /> DIESEL UNLEADED ° o <br /> BACKFILL WITH _ - o•° °•o I ° " III-III <br /> PEAGRAVEL AS PER - e o o,° o I I II °° ° I-III-III <br /> TANK MANUFACTURER I-III- O o ° II 0 0 <br /> SPECIFICATIONS ° STRAIGHT DROP TUBE STRAIGHT DROP TUBE III-I - <br /> _ 0. <br /> -III-I <br /> TYPICAL I III VIII °;° °0 1 \ TRAPPER SCREEN II I VIII I I�II a SHEET TITLE <br /> UST INSTALLATION NOTES -III-III o TRAPPER SCREEN TYPICAL <br /> i _ <br /> -I 1 1 1 1 1 1 ° •°�°• °� �\ -TYPICAL N // I I I I I I I I I I� <br /> 1. REINFORCE CONCRETE SLAB WITH#4 BARS AT 16"O.C.REINFORCING BARS TO BE NO LESS THAN 2"NO III 0•°° o�°0 �\ - z _ - z // III-III_ ZO,000 GALLON <br /> MORE THAN 4"FROM SURFACE. N z m <br /> _ ° - _ � _ ° - i 1=1 I- 3 DOUBLE WALL <br /> 2. REINFORCE CONCRETE SLAB AROUND MANHOLE WITH(2)#6 REBAR 60"IN LENGTH EACH SIDE. PLACE I I I I O,°od•0 \\ �, III-III LL <br /> REBAR 6"FROM SIDES OF MANHOLE. _ FIBERGLASS <br /> III-III o - - - - - - _ _ _ _ - - - - - - ° <br /> 3. SINGLE 1"CONDUIT TO EACH SUBMERSIBLE PUMP. PROVIDE SEAL-OFF AT SUMP&BUILDING WIRING _' <br /> =III-I ° ° ° 0 0 0 0 = <br /> TROUGH.CONTAINS LINE VOLTAGE WIRING. o o•° ° o ° o °• ° °°° ° ° ° °°° ° 0 °°�o^_•° 0 O °'� ° 12"x12"x�'G�QSiFL� O �•°° o• - z DETAILS <br /> (2) 12"x12"x11GA STEEL ° o III II o - TANK INSTALL <br /> ° 0 ° ° STRIKER PLATES BY nn ° ° Q••= 0 ° o O 'RIFPJ�A�E�B`C o.° oo ° o• <br /> 4. SINGLE 1"CONDUIT TO EACH TANK.LOOP HOME RUN FROM INTERSTITIAL SENSOR LOCATION TO III-III 0 p ° = O o. ° o O O O�° •° ° O o� °O O o ° O O° o o ° Eta O •� °O T�IPMANL1f�ACT> R ° • • -1-III- <br /> CONTAINMENT SUMP SENSORS AND TANK GAUGES. PROVIDE SEAL-OFF IN BUILDING AND AT TANK. =III- ° ° '°O° °°°° ° �••° ° o•• ° o ° °O -TANK MANUFACTURER TANK SHALL BE SET LEV - - - - -� m <br /> ROUTE TO INTRINSICALLY SAFE TROUGH IN BUILDING.CONTAINS ONLY LOW VOLTAGE WIRING FOR I=III <br /> SENSORS - -- - - - - - -_ - - - - - =III-I 1=1 =III-III-I I-III-I I 1=1 I-III-III-III-III I-III-III-III-III-III=1 =1 I-III-III-III=III-I 1 I-I I I-III=1 I =III III-III-III II I; <br /> - =III=III 1=III=III-III-III-III-III-III III-III-I I I I III III-III -_ -_ - - -_ - _ <br /> 5. USE PEA GRAVEL CONSISTING OF NATURALLY ROUNDED AGGREGATE, MIN 1/8"&MAX OF 314"IN SIZE, .-I I I _ _ _ - - _ _ =1 I_I I I- I-III=III -III ,III-III-I I_I I -III-III-I I -III-III ,III-III _I =III-III-III-III-III _ _ - <br /> III-III-III-III-III-III-III-III. . _ - _ _ =1 I=1 i-III III-III III-I I I- <br /> FREE OF CLAY,SLAG,CINDERS,OR DEBRIS.ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER'S -III I I -III-III-III III <br /> AND OWNERS FIELD REPRESENTATIVE. III_III -III_ -I III-III �- -III-III=III-III-I I I-I I -I I -I I I=III-III- - III-1 -� v <br /> -1 I_II 1=111=1I ;III=111=11 -I <br /> 6. TANK PAD MINIMUM 2'-0"OFF OUTSIDE WALLS OF TANKS,AND MUST COVER THE FOOTPRINT OF THE d SHEET NO. <br /> TANKS.REQUIRED TO PROVIDE FOR PROPER TANK HOLD DOWN,AND TO PREVENT ACCIDENTAL DRILLING (4)12"x12"x11GA STEEL STRIKER PLATES (4)12"x1R OPE I STEEL STRIKER PLATES <br /> INTO TANK. TYPICAL UNDER OPENINGS WITH MANWAYS BY TYPICAL UNDER OPENINGS WITH MAN WAYS BY END OF TANK <br /> TANK MANUFACTURER � <br /> TANK MANUFACTURER 2'-0"MIN. o FS-3 <br /> TANK SIZE VARIES WITH MANUFACTURER AND MODEL NUMBER <br /> 7. CUT CORNER WHERE MEETING ASPHALT PAVING ONLY. SQUARE CORNERS WHERE MEETING CONCRETE. Z-0"MIN. EXCAVATION <br /> ONLY <br /> EXCAVATION <br /> 8. REFER TO SITE SPECIFIC PLANS FOR ACTUAL PIPE RUNS AND NUMBER OF PRODUCT LINES. ONLY <br /> ,) UNDERGROUND TANK <br /> 9. THE PROPOSED FUEL STORAGE SYSTEM SHALL BEA XERXES SYSTEM(OR APPROVED EQUAL)WITH SECTION 20,000 GALLON � <br /> IL <br /> DOUBLE WALL,TURBINE ENCLOSURE, FIBERGLASS HYDROSTATIC TANK WITH LEAK DETECTION SCALE: 112"=1'-0" <br /> SENSORS,AND MEET OR EXCEED ALL CALIFORNIA TITLE 23 AND CUPA REQUIREMENTS. <br />