My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veeder-Root Line Leak Application Guide <br /> TLS-350 Consoles - WPLLD <br /> Hardware Required for Wireless Pressurized Line Leak Detection (WPLLD) <br /> WIRELESS PRESSURIZED LINE LEAK DETECTOR (WPLLD) <br /> Order one per line. <br /> MODEL NO. ITEM <br /> 849490-001 WPLLD KIT-FOR FE PETRO PUMPS' <br /> 849490-002 WPLLD KIT WITH SWIFTCHECK VALVE-FOR RED JACKET PUMPS(EXCLUDING QUANTUM)2 <br /> 849490-003 WPLLD KIT-3 GPH ON RED JACKET PUMPS(EXCLUDING QUANTUM)s <br /> 849490-004 WPLLD KIT W/O SWIFTCHECK VALVE FOR RED JACKET PUMPS(EXCLUDING QUANTUM) <br /> 849490-005 WPLLD KIT-FOR RED JACKET QUANTUM PUMPS4 <br /> 849490-006 WPLLD KIT-FOR THE RED JACKET PUMP <br /> 'Contains Line Leak Sensor,and installation kit for FE Petro pumps.Requires FE Petro Model R Check Valve,PM 400988932, <br /> 2Contains Line Leak Sensor,SwiOCheck valve,and installation kit for Red Jacket pumps. <br /> 38upports 3 GPH testing only.Contains Line Leak Sensor,and installation kit for Red Jacket pumps.Requires Red Jacket's Functional Element Assembly <br /> models 323-001-5 or 323-002-5.Does not support precision(0.2 GPH or 0.1 GPH)line testing. <br /> 4Contains Line Leak Sensor and installation kit for Red Jacket Quantum pumps.Requires purchase of SpikeCheck valve,PM 388-080-5,from Red Jacket. <br /> WPLLD MODULES <br /> One of each module from the table below is required.Order additional WPLLD Controller modules(P/N 330841-001)as <br /> required -each Controller module monitors up to 3 lines. <br /> MODEL NO. ITEM <br /> 330874-001 WPLLD AC INTERFACE MODULE(MAXIMUM 1 PER CONSOLE) <br /> 330883-001 COMMUNICATIONS MODULE(MAXIMUM 1 PER CONSOLE) <br /> 330841-001 WPLLD CONTROLLER MODULE(MAXIMUM 3 PER CONSOLE-) <br /> 'Maximum of 2 WPLLD Controller module per TLS-350J console <br /> WPLLD PRECISION TESTING SOFTWARE MODULE <br /> Precision line leak detection capability(0.2 gph 10.1 gph) requires one SEM (Software Enhancement Module)for the console <br /> that must be ordered separately from the table below. Not required for 3.0 gph-only line leak detection capability. <br /> TLS-350 t TLS-350J!TLS-350PLUS/ <br /> TLS-35OR(W/O BIR) TLS-35OR(WITH BIR) <br /> TESTING OPTION (SEM PIN) (SEM P/N) <br /> ULTIMATE TESTING 330160-010 330160-110 <br /> RISK MANAGEMENT 330160-060 330160-160 <br /> BASE COMPLIANCE 330160-050 330160-150 <br /> 3.0 GPH INCLUDED' INCLUDED' <br /> 'A SEM not required for 3 gph testing. <br /> WPLLD Precision Testing Frequencies <br /> ON-DEMAND(D) <br /> Testing can be initiated manually through the TLS Console. <br /> AUTO(A) <br /> Tests will run repetitively until a passing test is achieved.Once a passing test is achieved,testing will stop and recom- <br /> mence six months from the date of the last passing test. <br /> MONTHLY(M) <br /> Tests will run repetitively until a passing test is achieved.Once a passing test is achieved,testing will stop and recom- <br /> mence the first calendar day of the next month. <br /> REPETITIVE(R) <br /> Tests will run repetitively according to pre-programmed time intervals. <br /> Refer to the matrix below to determine which precision testing option best meets your needs: <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.